13.07.2015 Views

Read/Download - SKB

Read/Download - SKB

Read/Download - SKB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.4.14 Recovery measurements after cleaning by air-lift pumpingThe final cleaning of KFM06C by air-lift pumping caused a draw-down of 35 m. Aftercompleted pumping, the recovery of the groundwater table was monitored. The results aredisplayed in the diagram of Figure 5-22. Pressure registration was proceeding during six hours,and the water-yielding capacity could be determined from the diagram. An inflow of >30 L/minat a drawdown of 35 m was estimated.Borehole HFM16 is located c. 40 m south of drill site DS6. The pumping activities in KFM06Crevealed a clear hydraulic connection between HFM16 at shallow levels (= 1 Minute STOP :05/06/30 22:59:59hour:minFigure 5-22. Recovery of groundwater table in section 0–1,000.43 m of KFM06C after stop of air-liftpumping.49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!