WA1MBA MUD 2010 B.pdf - NTMS
WA1MBA MUD 2010 B.pdf - NTMS WA1MBA MUD 2010 B.pdf - NTMS
Outline• History– How did we get here?• Repeatability– Can we do this fifty times?• Next Steps– Set up to do a batch• Cost and build– How much? How do I get one?
- Page 1 and 2: 78 GHz LNA Project StatusReportWA1M
- Page 4 and 5: History - How did we get here• Se
- Page 6 and 7: History Version 4• During 2009/20
- Page 8 and 9: Poor boards, Long bondsRough board
- Page 10 and 11: Good boards, Short bondsSmooth boar
- Page 12: Unit 6Gain went from 9.3 dBTo 28.9
- Page 15: Repeatability• Continued to repla
- Page 19 and 20: Next Steps• Second attempt will b
- Page 21: Next steps• Live with the dimensi
- Page 24 and 25: Cost and build• Cost for a unit w
- Page 26 and 27: Cash up front
Outline• History– How did we get here?• Repeatability– Can we do this fifty times?• Next Steps– Set up to do a batch• Cost and build– How much? How do I get one?