13.07.2015 Views

The Planning System and Flood Risk Management - Offaly County ...

The Planning System and Flood Risk Management - Offaly County ...

The Planning System and Flood Risk Management - Offaly County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

68An additional document on interpretation of this guidance is given in thedocument “Irish SuDS: guidance on applying the GDSDS surface waterdrainage criteria” to be found athttp://www.irishsuds.com/guidance_ criteria.htm.<strong>The</strong>se are considered key reference material for those undertaking drainageimpact assessments.2 SATISFYING THE JUSTIFICATION TEST<strong>Planning</strong> Guidelines2.1 <strong>The</strong> <strong>Flood</strong> <strong>Risk</strong> Balance SheetIn any assessment of environmental risk a transparent record of how the riskwas assessed <strong>and</strong> is to be managed is essential. <strong>The</strong> <strong>Flood</strong> <strong>Risk</strong> Balance Sheet(See Table A2), once completed, provides a short summary of the riskassessment <strong>and</strong> the characteristics of that risk <strong>and</strong> its likely mitigation. <strong>The</strong><strong>Flood</strong> <strong>Risk</strong> Balance Sheet is a useful tool <strong>and</strong> should be used by planningauthorities to evaluate alternatives in making their decisions on developmentplans <strong>and</strong> local area plans especially in applying the Justification Test.<strong>The</strong> FRBS harness a number of indicators that have been developed to allowa comparison of appropriate l<strong>and</strong> uses in each plan area <strong>and</strong> whether theywould satisfy the terms of the Justification Test. <strong>The</strong>se indicators are:• Development is within existing flood risk area – existing flood warning<strong>and</strong> evacuation is in place. Importantly how easily will the area recoverfollowing an event? New development may lose local services for 12months if an event occurs;• Residual risk measures are easily applied <strong>and</strong> within a norm – Lowdepths of flooding can be easily designed out by modest alteration ofground or floor levels. 1st floor accommodation has implications forthe urban design <strong>and</strong> place setting of the development;• Egress <strong>and</strong> access. Impact on emergency planning provision <strong>and</strong> whetherrisks to development would be acceptable – This is a key issue <strong>and</strong>prime test in meeting the acceptable risk criterion in the JustificationTest. Access routes need to be natural <strong>and</strong> accessible in a flood to theemergency services;• Change in the number of people at risk as result of development –Introduction of more people will put a greater strain on the emergencyservices in an event. Whilst they may be accommodated at high elevationthey will require support very quickly even after the inundation hasstopped;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!