13.07.2015 Views

Chapter-III(59-80) - Pollution Control Board, Assam

Chapter-III(59-80) - Pollution Control Board, Assam

Chapter-III(59-80) - Pollution Control Board, Assam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA & RA STUDY FOR NAPHTHA SPLITTER PROJECT AT NUMALIGARH REFINERY LIMITEDBaseline Environmental Statuscomprises desludging at raw water treatment plant, DM Plant, Boiler Blowdown, CoolingTower Blowdown etc. OWS comprises desalter effluent, stripped sour water, processsteam condensate, floor washings etc. CRWS comprises oily effluents including sanitarywastewater etc. Details of waste water generation may be summarized as under:Table-3.44Sl. No. Source m 3 /day01. Oily Water Stream (OWS) 121502. Contaminated Rain Water Stream (CRWS) 71303. DM Plant 42204. CT Blow Down 290Total Waste Water Generation 2640All these effluents are treated in existing Effluent Treatment Plant which has beendesigned to treat 5,2<strong>80</strong> m 3 /day 220 m 3 /hr.There is a Sewage Treatment Plant (STP) meant for purification of the domestic sewageoriginating from NRL factory and NRL township. The direct discharge of raw sewage intothe inland surface water causes depletion of DO content in the receiving water bodycausing destruction of aquatic flora and fauna. This plant is designed to treat <strong>80</strong>0 m 3 /dayand conforms to the requisite standards.Projects & Development India Limited, Sindri Page 65 of <strong>80</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!