13.07.2015 Views

Operating Instructions - Snap-on Equipment

Operating Instructions - Snap-on Equipment

Operating Instructions - Snap-on Equipment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Pocket PC Automatic TestsHigh RPM Test10. Press the Start Test butt<strong>on</strong>.Figure 2D-4: TSI Test High RPM Stage Start Screen11. To begin the test, accelerate the vehicle to the required RPM range asindicated at the top of the screen, 2500 RPM ±10% in this case.— The Time Remaining counter counts down from 30 to 0 (or the numberof sec<strong>on</strong>ds set in High Speed Test Length down to 0) as l<strong>on</strong>g as RPMis within range.✓ You can access TSI Test Setup to set Test Length, Max RPM andMin RPM from the FGA main screen by pressing Maintenance >Setup > General Setup > TSI/Idle. See TSI / Idle Setup,page 2G-15.Figure 2D-5: TSI Test High RPM Stage Countdown ScreenThe system warns you and the test restarts if:— Low flow is detectedor— Minimum diluti<strong>on</strong> requirements are not met2D-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!