13.07.2015 Views

Business Plan - Canadian Coast Guard

Business Plan - Canadian Coast Guard

Business Plan - Canadian Coast Guard

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex A: CCG Capital Expenditures70Project DescriptionMaritime SecurityProjects Under Way• Automatic Identification System (AIS) - Implement a national VHF AIS Service and a Long Range Identificationand Tracking Service in Canada to enhance marine security and improve the safety of navigation in Canada.WaterwaysProjects Under Way• Detroit River Channel Restoration - Restore the charted depths of the downstream end of the Livingstone Channel,allowing ships on the Great Lakes/St. Lawrence Seaway System unrestricted, safe and efficient passage betweenthe upper and lower Great Lakes.Lifecycle Asset ManagementProjects Under Way• Configuration Management and Technical Data Management System - Develop and implement a system tosupport enhanced material acquisition and lifecycle through a nationally managed information infrastructure.Projects Approved in Principle, Awaiting Funding• Asset Management System (AMS) - Implement a national AMS that will include a fully integrated predictivemaintenance capability for vessels based on the current deployed version and licensing of MIMS.<strong>Coast</strong> <strong>Guard</strong> Fleet Operational ReadinessBudget 2009 Economic Action <strong>Plan</strong>In its 2009 Budget, the Government of Canada announced that it was providing CCG with $175M as part of thegovernment-wide Economic Action <strong>Plan</strong>. The specific planned projects are as follows:Projects Under WayAcquisitionsTotal Estimated Cost(millions of dollars)TEC Used2009-2010 ForecastTEC Remaining25.0 13.5 10.4 1.12.8 0.0 2.8 0.010.4 0.8 0.8 8.84.2 - 1.4 2.8Near-Shore Fisheries Research Vessels• Two 18 meter Near-Shore Fisheries Research Vessels 14.0 0.0 3.0 11.0• One 24 meter Near-Shore Fisheries Research Vessel 10.0 0.0 1.0 9.0Lifeboat Replacement <strong>Plan</strong>• Five 47’ Motor Lifeboats (Cape Class) 20.0 0.0 8.0 12.0Small Craft Acquisition <strong>Plan</strong> (SCAP)• 86 Small Craft: Fast Rescue Craft (FRC), Rigid Hull Inflatable (RHIB) and small work boats. 14.0 0.0 7.0 7.0Environmental Response (ER) Barges• 30 ER Barges 10.0 7 0.0 2.0 8.0Vessel Life ExtensionsCCGS Bartlett 20.0 0.0 20.0 0.0CCGS Tracy 20.0 0.0 20.0 0.0CCGS Limnos 10.0 0.0 10.0 0.0CCGS Cape Roger 12.0 0.0 0.0 12.0CCGS Tanu 12.0 0.0 0.0 12.07 In addition to Economic Action <strong>Plan</strong>, this figure includes $5M to be funded through Vote 5.<strong>Canadian</strong> <strong>Coast</strong> <strong>Guard</strong> — www.ccg-gcc.gc.ca

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!