The New India Assurance Co.Ltd.Maintenance, Repairs, ReplacementsAll premises must be maintained on regular basis. The standard of maintenance should be toensure the premises remain more or less in the original condition. Repairs should be carried outas and when required.Replacements should be made when it is due.The maintenance could be: -(1) Routine Maintenance(2) Occasional Maintenance(3) Seasonal Maintenance(4) Annual MaintenanceMaintenance and servicing of fixtures, fittings, equipments, gadgets, plants, machinery etc. shouldbe preferably by the manufacturer or his authorized service provider. An annual maintenancecontract should be executed wherever possible.In case the original manufactures are not available or not willing, or maintenance cost is toohigh, suitable reputed local agency should be identified for the purpose.Identification of such required service provider could be on PQT basis by issuing a tender notice,depending upon the quantum of work.Adequate care should be taken while acquiring these equipments for maintenance for a periodof 5 to 10 years or for the assured life span. It would be better to replace the equipments onexpiry of such period instead of either identifying local service provider or spend heavily onrepairs and maintenance.Reasonable life span of such fixtures, fittings and furniture could be as under: -(1) All electronic-oriented gadgets: 5 years(2) All movable and running equipments: 7 years(3) All non-movable running equipments: 10 years(4) All non-running equipments: 20 years152 MANUAL ON ESTATE & ESTABLISHMENT
The New India Assurance Co.Ltd.The equipment should be replaced when: -(1) An engineer/ architect certifies that it is no more worthy for the purpose(2) A repairer furnishes the bill which is more than 50% of the cost of purchase.(3) If it has worked more than the assured hours/kms/units(4) If it has performed for more than the normal assured life span replacement should be madeon proper verification.Possibility of replacement on exchange basis could also be examined.The up-keeping of premises is a day-to-day requirement.The maintenance of premises is a periodical one.External painting of all premises, at least once in 4 years preferably may be done depending onthe condition. It will not only maintain the premises well but also improve the condition of thestructure.While executing external maintenance works, necessary works like replacement of pipe lines,traps, junctions, patch repairs, removal of shrubs, plants, hangings etc. should also be carriedout.Repairs to chajja, cantilever projections, porticos, window sills, fins, pardi etc. should also becarried out.If the window shutters, ventilators or windows etc. all together are due for replacement, theseshould also be replaced along with external maintenance works, i.e. clubbing of all works requiringscaffolding for execution.Execution of external maintenance works would be premises-wise, location-wise, by invitingtender as per procedure.If necessary, technical consultants/architects may be appointed for that purpose.Internal maintenance of premises is necessary not only to provide better living conditions, butalso to arrest de-strengthening factors.Appropriate type of internal painting depending upon the size, category of the occupants, shouldbe provided.Internal painting with oil bound distemper for walls (open area) and color wash/white wash inbathroom and toilet area with oil painting for all doors, windows and grills are recommended.MANUAL ON ESTATE & ESTABLISHMENT153
- Page 101 and 102: The New India Assurance Co.Ltd.(xvi
- Page 103 and 104: The New India Assurance Co.Ltd.Guid
- Page 105 and 106: The New India Assurance Co.Ltd.· E
- Page 107 and 108: The New India Assurance Co.Ltd.(3)
- Page 109 and 110: The New India Assurance Co.Ltd.Howe
- Page 111 and 112: The New India Assurance Co.Ltd.Tend
- Page 113 and 114: The New India Assurance Co.Ltd.All
- Page 115 and 116: The New India Assurance Co.Ltd.(19)
- Page 117 and 118: The New India Assurance Co.Ltd.L-I
- Page 119 and 120: The New India Assurance Co.Ltd.B. M
- Page 121 and 122: The New India Assurance Co.Ltd.l Me
- Page 123 and 124: The New India Assurance Co.Ltd.ii.A
- Page 125 and 126: The New India Assurance Co.Ltd.Exec
- Page 127 and 128: The New India Assurance Co.Ltd.(12)
- Page 129 and 130: The New India Assurance Co.Ltd.(38)
- Page 131 and 132: The New India Assurance Co.Ltd.Exec
- Page 133 and 134: The New India Assurance Co.Ltd.(e)F
- Page 135 and 136: The New India Assurance Co.Ltd.Prin
- Page 137 and 138: The New India Assurance Co.Ltd.Issu
- Page 139 and 140: The New India Assurance Co.Ltd.Inst
- Page 141 and 142: The New India Assurance Co.Ltd.12.
- Page 143 and 144: The New India Assurance Co.Ltd.11.
- Page 145 and 146: The New India Assurance Co.Ltd.7. Y
- Page 147 and 148: The New India Assurance Co.Ltd.7. D
- Page 149 and 150: The New India Assurance Co.Ltd.Norm
- Page 151: The New India Assurance Co.Ltd.Any
- Page 155 and 156: The New India Assurance Co.Ltd.If t
- Page 157 and 158: The New India Assurance Co.Ltd.The
<strong>The</strong> <strong>New</strong> <strong>India</strong> <strong>Assurance</strong> <strong>Co</strong>.<strong>Ltd</strong>.<strong>The</strong> equipment should be replaced when: -(1) An engineer/ architect certifies that it is no more worthy for the purpose(2) A repairer furnishes the bill which is more than 50% of the cost of purchase.(3) If it has worked more than the assured hours/kms/units(4) If it has performed for more than the normal assured life span replacement should be madeon proper verification.Possibility of replacement on exchange basis could also be examined.<strong>The</strong> up-keeping of premises is a day-to-day requirement.<strong>The</strong> maintenance of premises is a periodical one.External painting of all premises, at least once in 4 years preferably may be done depending onthe condition. It will not only maintain the premises well but also improve the condition of thestructure.While executing external maintenance works, necessary works like replacement of pipe lines,traps, junctions, patch repairs, removal of shrubs, plants, hangings etc. should also be carriedout.Repairs to chajja, cantilever projections, porticos, window sills, fins, pardi etc. should also becarried out.If the window shutters, ventilators or windows etc. all together are due for replacement, theseshould also be replaced along with external maintenance works, i.e. clubbing of all works requiringscaffolding for execution.Execution of external maintenance works would be premises-wise, location-wise, by invitingtender as per procedure.If necessary, technical consultants/architects may be appointed for that purpose.Internal maintenance of premises is necessary not only to provide better living conditions, butalso to arrest de-strengthening factors.Appropriate type of internal painting depending upon the size, category of the occupants, shouldbe provided.Internal painting with oil bound distemper for walls (open area) and color wash/white wash inbathroom and toilet area with oil painting for all doors, windows and grills are recommended.MANUAL ON ESTATE & ESTABLISHMENT153