13.07.2015 Views

Property_Manu - Final - The New India Assurance Co. Ltd.

Property_Manu - Final - The New India Assurance Co. Ltd.

Property_Manu - Final - The New India Assurance Co. Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>The</strong> <strong>New</strong> <strong>India</strong> <strong>Assurance</strong> <strong>Co</strong>.<strong>Ltd</strong>.(11) <strong>The</strong> intending architects must furnish complete details about their educationalqualifications, work experience, specialized fields, major works executed in the last 5 to10 years.(12) <strong>The</strong> financial bid should be towards the scale of fees and the stages of release of payment.(13) A committee should be constituted for the scrutiny of pre-qualification applications.(14) Based on the information available, if required, they should also inspect some of theworks executed under their supervision.(15) Based on the category of the architect and based on the quantum of works executed bythem in the last 3 years, a panel of these architects should be prepared category-wise.(16) <strong>The</strong> architects must have been responsible for the execution of works under theirsupervision atleast one work equivalent to 30% of the category in which they are to beregistered, i.e. if an architect has executed a work costing above Rs.1.65 lacs, he can beconsidered to be in the panel of Category ‘A’ (Rs.5 lacs limit).(17) <strong>The</strong> panel should be reviewed on 3 yearly basis either for deletion, or for up gradation.(18) <strong>The</strong> architect identified for the work should also be requested to specify whether:(a)(b)(c)(d)<strong>The</strong>y have understood the work requirements, have inspected the site and areconversant with the location and surroundings and would be in a position to provideall the required services in all the fields for proper execution of the work.In case they are not in a position to render complete services, they should clarifythe fields in which additional experts like electrical engineer, mechanical engineer,communication engineer, lift engineer, air-conditioning engineer, horticulturespecialist, structural engineer, design engineer etc. are required and estimatedquantum of expenses that would be involved should be indicated.<strong>The</strong> architect should also indicate whether the cost of such services would beabsorbed by them from their professional charges or would have to be paidseparately to the consultants on his recommendations.<strong>The</strong> architect should also suggest atleast 2 to 3 names of such experts whoseservices would be required for the execution of work.132 MANUAL ON ESTATE & ESTABLISHMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!