<strong>November</strong> <strong>2008</strong> - 1 - 06-1422-034/3800PHOTOGRAPH 1Nicola Substation: Project area in station grounds.PHOTOGRAPH 2Nicola Substation: Oil filled reactors.Golder Associates


<strong>November</strong> <strong>2008</strong> - 2 - 06-1422-034/3800PHOTOGRAPH 3Nicola Substation: Diesel AST.PHOTOGRAPH 4Nicola Substation: Oil filled transformers.Golder Associates


<strong>November</strong> <strong>2008</strong> - 3 - 06-1422-034/3800PHOTOGRAPH 5Coldwater/Coquihalla: Existing 5L81 and 5L82 circuits from highway.PHOTOGRAPH 6Coldwater/Coquihalla: View of highway crossing.Golder Associates


<strong>November</strong> <strong>2008</strong> - 4 - 06-1422-034/3800PHOTOGRAPH 7Coldwater/Coquihalla: Oil pipeline crossing.PHOTOGRAPH 8Coldwater/Coquihalla: Abandoned rail line.Golder Associates


<strong>November</strong> <strong>2008</strong> - 5 - 06-1422-034/3800PHOTOGRAPH 9Chapmans Capacitor Station: Battery bank.PHOTOGRAPH 10Chapmans Capacitor Station: Diesel AST.Golder Associates


<strong>November</strong> <strong>2008</strong> - 6 - 06-1422-034/3800PHOTOGRAPH 11Chapmans Capacitor Station: Station service transformers.PHOTOGRAPH 12Chapmans Capacitor Station: Capacitor banks.Golder Associates


<strong>November</strong> <strong>2008</strong> - 7 - 06-1422-034/3800PHOTOGRAPH 13Yale: Rail line crossing.PHOTOGRAPH 14Yale: View of the existing 5L81 and 5L82 circuits from the highway.Golder Associates


<strong>November</strong> <strong>2008</strong> - 8 - 06-1422-034/3800PHOTOGRAPH 15Choate: Tailings pond underneath existing 5L82 circuit.PHOTOGRAPH 16Choate: View of Project corridor from tailings pond.Golder Associates


<strong>November</strong> <strong>2008</strong> - 9 - 06-1422-034/3800PHOTOGRAPH 17Choate: Tailings pond material.PHOTOGRAPH 18Choate: View of valley between existing 5L81 circuitand Project corridor.Golder Associates


<strong>November</strong> <strong>2008</strong> - 10 - 06-1422-034/3800PHOTOGRAPH 19American Creek: Existing capacitor bank.PHOTOGRAPH 20American Creek: Emergency generator and AST.Golder Associates


<strong>November</strong> <strong>2008</strong> - 11 - 06-1422-034/3800PHOTOGRAPH 21American Creek: Paved surface underneath capacitor bank.PHOTOGRAPH 22American Creek: Battery bank.Golder Associates


<strong>November</strong> <strong>2008</strong> - 12 - 06-1422-034/3800PHOTOGRAPH 23Sylvester Road: Vegetation on existing 5L82 right-of-way.PHOTOGRAPH 24Sylvester Road: Salvation Army maintenance facility.Golder Associates


<strong>November</strong> <strong>2008</strong> - 13 - 06-1422-034/3800PHOTOGRAPH 25Sabo Road: Vegetation on existing 5L82 right-of-way.PHOTOGRAPH 26Sabo Road: Residential land use underneath existing 5L82 right-of-way.Golder Associates


<strong>November</strong> <strong>2008</strong> - 14 - 06-1422-034/3800PHOTOGRAPH 27Stave Lake: Dam.PHOTOGRAPH 28Stave Lake: Dam – existing 5L82 circuit.Golder Associates


<strong>November</strong> <strong>2008</strong> - 15 - 06-1422-034/3800PHOTOGRAPH 29Stave Lake: Dam – Mission Landfill.PHOTOGRAPH 30Stave Lake: <strong>BC</strong> <strong>Hydro</strong> facility.Golder Associates


<strong>November</strong> <strong>2008</strong> - 16 - 06-1422-034/3800PHOTOGRAPH 31256th Street: Materials storage on Project corridor.PHOTOGRAPH 32256th Street: Gravel pit south of Project corridor.Golder Associates


<strong>November</strong> <strong>2008</strong> - 17 - 06-1422-034/3800PHOTOGRAPH 33256th Street: Existing 5L82 right-of-way.PHOTOGRAPH 34256th Street: Fill material on Project corridor.Golder Associates


<strong>November</strong> <strong>2008</strong> - 18 - 06-1422-034/3800PHOTOGRAPH 35256th Street: Water Resources, North AST.PHOTOGRAPH 36256th Street: Water Resources, South AST.Golder Associates


<strong>November</strong> <strong>2008</strong> - 19 - 06-1422-034/3800PHOTOGRAPH 37256th Street: Water Resources, fenced clearing with both ASTs.PHOTOGRAPH 38256th Street: Existing 5L82 ciruit to the south east ofwater resources ASTs.Golder Associates


<strong>November</strong> <strong>2008</strong> - 20 - 06-1422-034/3800PHOTOGRAPH 39Pipeline Road: Tree cover on existing 5L82 right-of-way.PHOTOGRAPH 40Pipeline Road: Project corridor crossing.Golder Associates


<strong>November</strong> <strong>2008</strong> - 21 - 06-1422-034/3800PHOTOGRAPH 41Meridian Station: Localized staining underneath transformer.PHOTOGRAPH 42Meridian Station: AST with secondary containment.Golder Associates


<strong>November</strong> <strong>2008</strong> - 22 - 06-1422-034/3800PHOTOGRAPH 43Meridian Station: Station Project area.PHOTOGRAPH 44Meridian Station: Station area with previous spills.Golder Associates


<strong>November</strong> <strong>2008</strong> - 23 - 06-1422-034/3800PHOTOGRAPH 45Westwood Plateau: Fill material underneath existing 5L82 circuit.PHOTOGRAPH 46Westwood Plateau: Fill material underneath existing 5L82 circuit.O:\Final\2006\1422\06-1422-034\Discipline Reports\DRAFT_31001_08\Appendix L - Contaminated Sites\Appendices\Appendix VII - SitePhotos\Appendix VII - Site Photos.docGolder Associates