2776THE KENYA GAZETTE 17th May, 2013The following are the anticipated impacts and proposed mitigationmeasures:EnvironmentalImpactsConstructionMaterialsSourcingDisruption ofEcosystemMitigation MeasuresSource building materials from supplierswho use environmentally friendlyprocesses in their operations.Ensure accurate budgeting and estimationof actual construction materialrequirements to ensure low wastage.Apply recyclable materials to the extentpossible. Specify locations for trailers andequipment, and areas of the site whichshould be kept free of traffic, equipment,and storage.Design and implement an appropriatelandscaping programme to help in revegetationof part of the site afterconstruction.Surface Drainage Development storm water managementplan for the site (piping systems orretention ponds or tanks) forimplementation after the building iscomplete.Solid WasteManagementDust and GaseousEmissionsProvide oil interception and grit traps toall drainage during the construction.Oil spill areas (pump locations, servicebays, and stores) should be budded toprevent runoff pollution.Ensure only optimum material usage toavoid wastage and resource sustainability.Use of durable materials that will not needto be replaced as often, thereby reducingthe amount of construction wastegenerated over time.Use construction materials containingrecycled content when possible and inaccordance with accepted standards. Provide reusable materials such ascartons, cement bags, empty metal andplastic containers for recycling.Dispose waste more responsibly bydumping at designated dumping sites orlandfills only the use of a registered wastedisposal company is encouraged.Removal of existing solid wastes on thesite including papers, plastics, metallicwastes, fabrics, etc. to approved publicdumping area.Removal of hazardous materials (ewastes,wastes from passenger processing)to designated areas approved by KAA. Dispose of excavated earth safetyconsidering it could be contaminated.Avoid dusty excavation works to theextent possible, especially during the dryweather. Ensure construction equipment emitsminimal emissions. Sensitize truck drivers to avoidunnecessary revving vehicle engines andswitch off vehicle engines.Ensure proper planning of transportationof materials.Sprinkle water on dry materials to preventdust emissions.Effluent Emissions Provide means for handling sewagegenerated by construction workers.Conduct regular checks for sewage pipeblockages or damages since such vicescan lead to release of the effluent into theland and water bodies during construction.Monitor effluent quality regularly toensure that the stipulated discharge rulesand standards are not violated.Noise Pollution Sensitize construction vehicle drivers andmachinery operators to switch off enginesof vehicles or machinery not being used.Energy Resourcesand UseWater Resourcesand UseViolation of Rulesand RegulationsOccupational Healthand SafetyCatastrophesSensitize construction drivers to avoidgunning of vehicle engines or hootingespecially when passing through sensitiveareas.Ensure that construction machinery is keptin good condition to reduce noisegeneration.Ensure that all power generators andheavy duty equipment are kept in noiseproof housing to minimize effects of theirnoise levels.Ensure electrical equipment, appliancesand lights are switched off when not beingused.Ensure planning of transportation ofmaterials to ensure that fossil fuels (diesel,petrol) are not consumed in excessiveamounts.Monitor energy use during constructionand set targets for reduction of energy use. Ensure quantification of constructionwater.Ensure no wastes are discharged into opendrainage systems. Provide drainage outfalls with oilinterceptors and grit traps. Ensure that all building plans areapproved by the Local Authority and thelocal Occupational Health and SafetyOffice.Registration of the premises under theFactories and Other Places of Work ActCap514, <strong>Law</strong>s of <strong>Kenya</strong> is mandatory.A general register should be kept withinthe facility as stipulated in Sec 62 (1) ofthe Factories and Other Places of WorkAct. The abstract of the Factories and OtherPlaces of Work Act must be displayed atprominent places within the site. Ensure that provisions for reportingincidents, accidents and dangerousoccurrences during construction usingprescribed forms obtainable from the localOccupational Health and Safety Office arein place. Ensure that the premises are insured as perstatutory requirements (third party andworkman’s compensation). Develop, document and displayprominently an appropriate policy forconstruction works. Provisions must be put in place for theformation of a Health and SafetyCommittee (with appropriaterepresentation) during the construction. Ensure that machinery, equipment,personal protective equipment, appliancesand hand tools used in construction docomply with the prescribed safety andhealth standards and be appropriatelyinstalled maintained and safeguarded. All machines and other moving parts ofequipment must be safe to the workersfrom injury.
17th May, 2013 THE KENYA GAZETTE 2777Train and supervise workers safety ofmachinery use and otherprocedures/operations.Equipment e.g. fire extinguishers must beexamined by authorized persons.Ensure that materials are stored or stackedin such manner as to ensure their stabilityand prevent any fall or collapse.Ensure that items are not stored/stackedagainst weak walls and partitions.Design suitable documented emergencypreparedness and evacuation procedures tobe used during any emergency.Ensure that adequate provisions are inplace to immediately stop any operationswhere there in an imminent and seriousdanger to health and safety and toevacuate workers.Ensure that the most current emergencytelephone numbers posters areprominently and strategically displayedwithin the construction site.Well stocked first aid box which is easilyavailable and accessible should beprovided within the premises at all timesduring construction.Provision must be made for persons to betrained in first aid, with a certificate issuedby a recognized body. Firefighting equipment such as fireextinguishers and hydrant systems shouldbe provided at strategic locations such asstores and construction areas.Regular inspection and servicing of theequipment must be undertaken by areputable service provider and records ofsuch inspections maintained.Hazard-warning signs “NO SMOKING”,“SWITCH OFF ENGINE”, “SWITCHOFF MOBILE PHONE” at differentstrategic places at the proposed station.Pollution Ensure that workers at the excavation sitesand other dusty sites are adequatelyprotected from inhalation of substantialquantities of dust through provision ofsuitable protective gear.Provide workers in areas with elevatednoise and vibration levels, with suitableear protection equipment such as earmuffs.Suitable overalls, safety footwear, dustmasks, gas masks, respirators, gloves, earprotection equipment etc should be madeavailable and construction personnel mustbe trained to use the equipment.Ensure that construction workers areprovided with an adequate supply ofwholesome drinking water which shouldbe maintained at suitable and accessiblepoints.Sanitary Ensure that conveniently accessible, clean,orderly, adequate and suitable washingfacilities are provided and maintained inwithin the construction site.ImpairedVentilation andElectricityAll work places must be kept in a cleanstate, and free from effluvia arising fromany drain, sanitary convenience ornuisance during construction.Enough space must be provided within thepremises to allow for adequate naturalventilation through circulation of fresh air.There must be adequate provision forartificial or natural lighting in all parts thepremises in which persons are working orpassing.Circuits must not be overloaded.Distribution board switches must beclearly marked to indicate respectivecircuits and pumps. There should be no live exposedconnections.Electrical fittings near all potential sourcesof ignition should be flame proof.All electrical equipment must be earthed.The full report of the proposed project is available for inspectionduring working hours at:(a) Director-General, NEMA, Popo Road, off Mombasa Road,P.O. Box 67839–00200, Nairobi.(b) Permanent Secretary, Ministry of Environment and MineralResources, NHIF Building, Community, P.O. Box 30521,Nairobi.(c) County Director of Environment, Nairobi County.The National Environment Management Authority invitesmembers of the public to submit oral or written comments withinthirty (30) days from the date of publication of this notice to theDirector-General, NEMA, to assist the Authority in the decisionmaking process of the plan.MR/2436527GAZETTE NOTICE NO. 6719B. M. LANGWEN,for Director-General,National Environment Management Authority.THE ENVIRONMENTAL MANAGEMENT ANDCO-ORDINATION ACT(No. 8 of 1999)THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITYENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORTFOR THE PROPOSED DEVELOPMENT OF CORDISONS LAMUWIND POWER PROJECT IN LAMU COUNTYINVITATION OF PUBLIC COMMENTSPursuant to Regulation 21 of the Environmental Management andCoordination (Impact Assessment and Audit) Regulations, 2003, theNational Environment Management Authority (NEMA) has receivedan Environmental Impact Assessment Study Report for the aboveproposed project.The Proponent (Cordisons International (K) Ltd) intends todevelop a wind power project with an expected output of 300 MW inLamu.The following are the anticipated impacts and proposed mitigationmeasures:Possible Impacts Proposed Mitigation MeasuresArcheology andcultural heritageTerrestrialEcologyConsider engaging an archeologist during theconstruction phase to monitor excavatedareas for potential archeological finds aroundeach wind turbine location.Where possible avoid destruction of trees.Use dust suppression methods such aswatering down excavated areas during dryperiods to avoid dust generation impacts onecology.Livestock and wild herbivores should beallowed to graze/browse over most of thelandscape to sustain dispersal and spatialrecruitment of plant species.Micro-siting of the turbines should be doneaway from riverine areas.No construction activities shall occur within
- Page 1 and 2: THE KENYA GAZETTEPublished by Autho
- Page 3 and 4: 17th May, 2013 THE KENYA GAZETTE 27
- Page 5 and 6: 17th May, 2013 THE KENYA GAZETTE 27
- Page 7 and 8: 17th May, 2013 THE KENYA GAZETTE 27
- Page 9 and 10: 17th May, 2013 THE KENYA GAZETTE 27
- Page 11 and 12: 17th May, 2013 THE KENYA GAZETTE 27
- Page 13 and 14: 17th May, 2013 THE KENYA GAZETTE 27
- Page 15 and 16: 17th May, 2013 THE KENYA GAZETTE 27
- Page 17 and 18: 17th May, 2013 THE KENYA GAZETTE 27
- Page 19 and 20: 17th May, 2013 THE KENYA GAZETTE 27
- Page 21 and 22: 17th May, 2013 THE KENYA GAZETTE 27
- Page 23 and 24: 17th May, 2013 THE KENYA GAZETTE 27
- Page 25 and 26: 17th May, 2013 THE KENYA GAZETTE 27
- Page 27 and 28: 17th May, 2013 THE KENYA GAZETTE 27
- Page 29 and 30: 17th May, 2013 THE KENYA GAZETTE 27
- Page 31 and 32: 17th May, 2013 THE KENYA GAZETTE 27
- Page 33 and 34: 17th May, 2013 THE KENYA GAZETTE 27
- Page 35 and 36: 17th May, 2013 THE KENYA GAZETTE 27
- Page 37 and 38: 17th May, 2013 THE KENYA GAZETTE 27
- Page 39 and 40: 17th May, 2013 THE KENYA GAZETTE 27
- Page 41 and 42: 17th May, 2013 THE KENYA GAZETTE 27
- Page 43 and 44: 17th May, 2013 THE KENYA GAZETTE 27
- Page 45 and 46: 17th May, 2013 THE KENYA GAZETTE 27
- Page 47 and 48: 17th May, 2013 THE KENYA GAZETTE 27
- Page 49 and 50: 17th May, 2013 THE KENYA GAZETTE 27
- Page 51: 17th May, 2013 THE KENYA GAZETTE 27
- Page 55 and 56: 17th May, 2013 THE KENYA GAZETTE 27