13.07.2015 Views

Report of the Montpelier City Council's Citizen Budget Review ...

Report of the Montpelier City Council's Citizen Budget Review ...

Report of the Montpelier City Council's Citizen Budget Review ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong> - Department <strong>of</strong> Public WorksProject Time Performance TrackingProject NameProject ManagerProject Cost Estimate /<strong>Budget</strong> Project Type Funding Source Project Phase Estimated StartEstimatedFinishEstimatedDays Actual Start Actual Finish Actual DaysVariance (inDays)CommentsADA Transition Plan Tom McArdle N/A ADA Compliance (work book) Draft in Progress 1-Jan-2011 1-Jun-2012 60 20-Jul-2012 Meeting w/Dr Campbell; Committee to review in JuneTraffic Signal Upgrades (crosswalks) Tom McArdle $ 33,000.00 Traffic Signal - MUTCD & ADA ComplianceCIP/ TrafficImpact fees Contract Awarded/RYG 1-May-2012 15-Jun-2012 13-Jun-2012 State/Main, Bailey/State - 7/13/12 w/adjustments afterBarre Street Culvert (FHWA - flood damage)Engineering RFQ Design Bid Tom McArdle $ 405,000.00 Culvert & Headwall Reconstruction FEMA? Out to Bid by August 12 16-Nov-2012 Dufresne Group - cost proposal - delaysFHWA?/Rte 302 Culvert (Crossway / AAA) Tom McArdle $ 88,000.00 Culvert & Headwall ReconstructionRouleau? Contract w/ CEA 26-Sep-2012 24-May-2013 26-Sep-2012 Don Weston ExcavatingStreet Light Committee LED lights) Tom McArdle LED light replacement plan Council decision May 23rd Council meeting - PRRidge Street Slope Stabilization Kurt Motyka $ 180,000.00 Earth retaining wall, street & utility reconstruction CIP Construction started 16-Aug-2012 60 20-Jun-2012 28-Aug-2012Spring Street Bridge Deck Replacement Tom McArdle $ 100,000.00 Bridge deck surface reconstruction CIP-Bond Spring 2013VTRANS Structures Grant applied for -VTRANS not received/ Hydraulic AnalysisTerrace Street Culvert Replacement Todd /Kurt $ 225,000.00 Structures grant replacementStructures/ CIP received.Todd talked w/Pat RossState Street Culvert Lining (Bailey Ave) Todd / Tom Postponed CIP Camera Inspection Needed look @ I:\ drive ??Asphalt Road Cracksealing Tom/ Brian $ 32,500.00 Maint (Fy12 $17,500 and FY13 $15,000) Operating River/Berlin St. 30-Jun-2012 Startup Spring 2013Taplin Street Kurt / Zach $ 35,000.00 Stormwater Retention Fund 30 Spring Clean up 30-May-2012 5-Jun-2012 Plant trees, paving by Street DivisionClarendon Avenue Drainage Brian/ Zach $ 5,000.00 drainage Operating 1-Oct-2012 Cross culvert and parallel to brook - Colombo 223-7969Street Rehab & Paving (FY13) list <strong>of</strong> projects24-Aug-2012Towne Hill Road/ Bike Path Tom $ 300,000.00 Road rehabilitation CL2 Grant/CIP $175k in CL2 Paving Grant? 24-Aug-2012 HOLD - No Grant $$Upper Main/Phillips Road Todd/Zach/Brian $ 40,000.00 Road resurface and drainage CIP Design done, start drainage May 21 24-Aug-2012Dover Road/Woodrow-College-Emmons Todd/Zach/Brian $ 50,000.00 Road rehab/resurface/drainage CIP Design done 24-Aug-2012Hubbard Park Drive Tom/Brian $ 120,000.00Drainage issue (Benoit); street drainage 24-Aug-2012Liberty Street (College-Heaton) Tom/Kurt $ 78,558.00 Road resurface and drainage CIP Drainage completed 24-Aug-2012Sidewalk and bike path Repairs (FY13) list <strong>of</strong> projectsLiberty Street (Heaton-Fuller) Tom $ 85,000.00 Survey - Zach & Kurt CIP FY13 1-Oct-2012 Bid awarded to J. Hutchins, Inc. - not accepted yetBike Path (DLC-Junction Road) Kurt/Brian $ 30,000.00CIP FY13 Low bid Don Weston 1-Jun-2012 13-Jul-2012 24-Aug-2012Spot repairs (FY12): State, East State Tom Zach $ 30,000.00FY12 Operating Low bid Don Weston 1-Jun-2012 13-Jul-2012 30-Jun-2012Accessible spaces at Kellogg-Hubbard Library Tom $ 10,000.00 Contract PCC FY12/CIP/ADA Low bid Don Weston 1-Jun-2012 13-Jul-2012 30-Jun-2012Carr Lot Todd Law/ Bill Engineering/ Construction Grants/ Bond Draft Plans- culverts shot!! MPM Jeff Tucker, design by StantecDistrict Heat Project Todd/Zach/Kurt Engineering/ Construction Support Grants/ Bond Draft Plans- Todd <strong>Review</strong> Meeting 5/23 with pipe designerCherry Avenue Retaining Wall Brian/ Kurt/ Zach $ 15,000.00 Retaining wall CIP Survey/design 1-Sep-2012 Survey; drafting plansHill Street Retaining Wall Tom $ 75,000.00 Retaining wall CIP Final Design Complete/ROW needs completion? w/DeWolfe EngineeringFranklin Street Culvert Abandonment Kurt Motyka $ 5,000.00 CSO - sealed up in 2011 Operating 24-Jun-2012 11-Jul-2012 CompleteGranite Street Culvert Brian/ Todd drainage Operating Camera Inspection done Hold til SpringBike Path Bridge Rehab Kurt Motyka $ 130,000.00 Bridge rehab CIP- fy13 Project underway 23-Apr-2012 27-Jul-2012 2-Jul-2012 Steel fabricating nowRialto (State St) Bridge Deck and Western AbutmentRepair temporary steel deck plate and cap <strong>the</strong> westerncap Todd/Tom $ 35,000.00 abutment Operating Hold til SpringFEMA Flood Mitigation Kurt Motyka Replace blown motor FEMA/ CIP Vtrans holdup in accounting 14-May-2012 30-Jun-2012 Substantial completionMiscellaneous FEMA Sites (40) & FHWA sites Tom McArdle/ Kris Accounting Follow-up/DPW finish projects FEMA 15-Jun-2012 Brian to get handwritten work orders to Tom/KrisRiver Street Sewer - Phase II Kurt Motyka $ 500,000.00 Sewer Transmission Preliminary Plans completed 5/1/2013??? Meeting in May w/Berlin Sewer CommissionIsabel CircleStormwater Retention/rain gardenCrosswalk Enhancement Grant Kurt/Zach $ 60,000.00 Street Enhancement TE Grant 1-May-2013 "on hold" - Next yearCIP/ Roddy Awaiting approval <strong>of</strong> improvementMarvin Street Slope Tom McArdle $ 34,000.00 Slope StabilizationCook/ FEMA?? project ? field trip/peer review - Knight/JBDPWG Solar Panels Todd Law/Eric $ - Energy <strong>of</strong>fset GMP Steve @Peck 23-Apr-2012 14-May-2012 14-May-2012 Need Building Permit, per GlenFY 12Guernsey Ave Street Rehabilitation Tom/ Brian? $ 5,500.00 Street RehabOperating 30-Jun-2012 30-Jun-2012FY 13Hubbard Park Drive culvert Tom/ Kurt? $ - drainageOperating On-street drainage 7-Aug-2012 Wetlands delineatorLague Slope Stabliziation Kurt/ JB Stevens? $ - Slope Stabilization CIP easement obtained. Borings taken. SpringHillside Dr/ Waverly Place stairs Brian/ Streets repair to stairs/tree removal/slope future CIP repairs Stabilized for flowCNA/Building Needs Todd/Burtis 24-Sep-2012Berlin Street @Parker's Brian tie into existing catch basinDouble utility polesworking on it since emailSpring Street Roundabout Sinkhole Brian Drain repair ??TOTAL \ 120 - -Page 65 <strong>of</strong> 107I:\misc project. folders\Project Inventory & Tracking 25Sept2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!