13.07.2015 Views

Report of the Montpelier City Council's Citizen Budget Review ...

Report of the Montpelier City Council's Citizen Budget Review ...

Report of the Montpelier City Council's Citizen Budget Review ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7DEPARTMENT <strong>of</strong> PUBLIC WORKSPERFORMANCE MEASURES• Within five (5) hours <strong>of</strong> <strong>the</strong> end <strong>of</strong> a normal winter storm, roads will be substantially. open.• Within ten (10) hours <strong>of</strong> <strong>the</strong> end <strong>of</strong> a normal winter storm, sidewalks will besubstantially open.• During winter months, a pothole will be filled within three (3) working days <strong>of</strong> beingreported (wea<strong>the</strong>r and road conditions permitting).• During non-winter months, a pothole will be filled within two (2) working days <strong>of</strong> beingreported (wea<strong>the</strong>r permitting). .• Construction & Access Permits will be executed within three (3) days.• Fire hydrants will be flushed annually, with a five (5) workday period.• One-quarter (1/4) to one-third (1/3). <strong>of</strong> <strong>the</strong> sanitary sewer system will be cleanedduring each fiscal year.• Otie-third (1/3) <strong>of</strong> catch basins on <strong>the</strong> <strong>City</strong>'s drainage system will be cleaned andinspected annually.• The Water Treatment Plant will continue to produce high quality water, and <strong>the</strong> sourcewill be protected with regular inspections for potential hazards.• The Wastewater Treatment Plant will treat waste from <strong>the</strong> sanitary sewer system andrun <strong>the</strong> facility in such a way that violations <strong>of</strong> <strong>the</strong> discharge permit do not occur.• A Pavement Condition Index <strong>of</strong> 70 points will be established for <strong>the</strong> <strong>City</strong>'s streets androads, with <strong>the</strong> understanding that Class 1 roads will be paved by VTrans.• Improvement <strong>of</strong> <strong>the</strong> condition <strong>of</strong> <strong>the</strong> <strong>City</strong>'s sidewalks will continue, and a method tocalculate a condition assessment tool to evaluate <strong>the</strong> sidewalks will be established.1:\DPW\Performance Measures.docxPage 64 <strong>of</strong> 107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!