25commissioned. Well SG - 7 was drilled to a depth of 1438 m.1980 Third 6 MWe t urbogenerator was commissioned. WellsSG - 8, SG-9, SG-l0, <strong>and</strong> SC - 1t were drilled to depths of1603, 994, 425 <strong>and</strong> 1'41 m respectively.1981 First unit of power plant 2 of 25 MWt was commisioned<strong>in</strong> May. Second <strong>and</strong> third units of power plant 2 of 2 X 25MWt were commissioned 1n September.1982 The tota l <strong>in</strong>stalled capacity <strong>in</strong> power plants 1 , 2 <strong>and</strong>3 became about 46 MWt • 2 MWe, 75 MWt <strong>and</strong> 6 MWerespectively. The last well to date, namely SG-12 wasdrilled to a depth of 1488 m. Relnjection was done for 25days <strong>in</strong> <strong>the</strong> months of September <strong>and</strong> October.