13.07.2015 Views

temperature and pressure in the svartsengi ... - Orkustofnun

temperature and pressure in the svartsengi ... - Orkustofnun

temperature and pressure in the svartsengi ... - Orkustofnun

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

flash steam for heat <strong>and</strong> electricity generation. The pilotplant studies were <strong>the</strong> basis for <strong>the</strong> design of <strong>the</strong> firststages <strong>in</strong> construct<strong>in</strong>g <strong>the</strong> plant Never<strong>the</strong>less a lot ofdetails. materials <strong>and</strong> components had to be tested before<strong>the</strong> ma<strong>in</strong> plant was designed <strong>and</strong> constructed. All <strong>the</strong> same<strong>the</strong> power plant has been able to supply <strong>the</strong>rmal energy to<strong>the</strong> different communities accord<strong>in</strong>g to <strong>the</strong> requirement atany time s<strong>in</strong>ce <strong>the</strong> commencement of <strong>the</strong> programme.2.9 History of developmentThe highlights of <strong>the</strong> historical development of t he projectare as follows (Bjornsson. 1983):1971 - 1972 Wells SG-2 <strong>and</strong> SG - 3 were drilled to depths of 240<strong>and</strong> 400 m respectively. The results turned out to be veryencourag<strong>in</strong>g prov<strong>in</strong>g <strong>the</strong>re was a high <strong>temperature</strong> fieldwith a br<strong>in</strong>e <strong>temperature</strong> of 235°C.1974 The <strong>Orkustofnun</strong> (NEA) built aSvartsengi. Two wells weredrilled. SG-4pilot plant at(1700 m) <strong>and</strong> SO-5(1525 m).1974-1975 Tests were carried out by <strong>the</strong> <strong>Orkustofnun</strong> (NEA)<strong>in</strong> <strong>the</strong> pilot plant which later became <strong>the</strong> basis for <strong>the</strong>design of power plant 1.1976 Prelim<strong>in</strong>ary power plant of 3 MWt was commissioned onNovember 6.1977 First unit of power plant 1 of 8 MWt was commissioned<strong>in</strong> November.1978 First 1 MWe turbogenerator was commissioned <strong>in</strong> April.Second unit of power plant 1 of 12.5 MWt was c ommissioned<strong>in</strong> November. Well SG-6 was drilled to a depth of 1734 m.1979 Third <strong>and</strong> fourth units of power plant of 2 X 12.5MWt were commissioned. The second 1 MWe turbogenerator was

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!