13.07.2015 Views

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

44<strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> <strong>Enterprise</strong> <strong>Edition</strong><strong>User</strong> <strong>Manual</strong>9. Stop <strong>Picture</strong> <strong>Perfect</strong>.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> 4.5 Installation <strong>Manual</strong>, Chapter 3, “Verify theexisting database”, section “Shut down <strong>Picture</strong> <strong>Perfect</strong>".10. The database conversion process is NOT needed since the current version is PP 4.5.1.C.2 <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> server installation1. Log in to the target server.2. Install the OS (AIX or Linux).Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 4 or 5,depending on your server type (AIX or Linux).3. Prepare the server for <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> (phase 2).Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 6, “Installing<strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong>”, section “Running the pre-installation setup.”4. Find out if the customer requires installing IT security/OS hardening tools and proceedaccordingly.5. Perform the <strong>Picture</strong> <strong>Perfect</strong> base package installation.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 6, “Installing<strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong>”, “Installing the <strong>Picture</strong> <strong>Perfect</strong> base package".Note 1: Set up database sizes according to old retrieved sizes as described in Prerequisites on page 26, item 3,Database table sizes, plus expected growth and new History sizes where applicable.Note 2: Restore the base and badge database that was backed up in the previous section.IMPORTANT: If this is a subhost with high level latency (>150 ms, overseas server),restore the base converted database only.Note:APB status, Last Access data will be lost since that data is not replicated and is being recovered in thisprocess from the nethost6. License the system.7. DO NOT REBOOT. This prevents <strong>Picture</strong> <strong>Perfect</strong> from starting up and attempting to connectto the micro controllers.8. Perform a database cleanup to remove old host records and make sure the id of the systemconfiguration record is correct. Use the following steps:a. Set <strong>Picture</strong> <strong>Perfect</strong> profile:. /cas/bin/profileb. Start up the database by running the command:su - ppadmin -c oninitc. Remove all host records by running the command:/cas/bin/sqlstmt "DELETE FROM host"d. Reset system the config record id to 1:/cas/bin/sqlstmt "UPDATE system_config SET id = 1"

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!