Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...
Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ... Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...
38Picture Perfect 4.6 Enterprise EditionUser Manuale. Perform the optional package installation (netlan, impexp, image), restore thedatabase(s) where applicable, and reboot the server when requested.Follow the instructions in Picture Perfect 4.0 Installation Manual, Chapter 6, “InstallingPicture Perfect”, section “Installing optional packages and interfaces".f. Execute the database conversion and follow instructions to perform a backup for thetarget-converted database.Follow the instructions in Picture Perfect 4.6 Installation Manual, Chapter 3, “Runningthe conversion utility”.g. Back up the converted database as required by the conversion utility (two copiesrecommended).IMPORTANT: If this is a subhost with high-level latency (>150 ms, overseas server),perform an additional backup of the converted base database only to a separate file.To perform an additional backup for only the converted base database, please followthe steps below from the command line:• Login into a terminal session and login as ppadmin.• Set Picture Perfect profile by running:. /cas/bin/profile• Start up the database by running:oninit• Perform the converted database backup by running:cba -c -b -v -d -baseNote:This will create a backup o the converted base database to the file named in thecommand. Use that backup during the installation of the subhost with high-level network latency.h. Transfer the converted database file to a safe place (PC or the target server), since thecurrent server could be used for other conversions.C.2 Picture Perfect 4.6 server installation1. Log in to the target server.2. Install the OS (AIX or Linux).Follow the instructions in Picture Perfect 4.6 Installation Manual, Chapter 4 or 5,depending on your server type (AIX or Linux).3. Prepare the server for Picture Perfect 4.6 (phase 2).Follow the instructions in Picture Perfect 4.6 Installation Manual, Chapter 6, “InstallingPicture Perfect 4.6”, section “Running the pre-installation setup".4. Find out if the customer requires installing IT security/OS hardening tools and proceedaccordingly.5. Perform the Picture Perfect base package installation.
Chapter 3Upgrading Picture Perfect version 4.0/4.5.1 to 4.639Follow the instructions in Picture Perfect 4.6 Installation Manual, Chapter 6, “InstallingPicture Perfect 4.6”, section “Installing the Picture Perfect base package".Note 1: Set up database sizes according to old retrieved sizes as described in Prerequisites on page 26, item 3,Database table sizes, plus expected growth and new History sizes where applicable.Note 2: Restore the base and badge converted database.IMPORTANT: If this is a subhost with high level latency (>150 ms, overseas server),restore base converted database only.Note:APB status, Last Access data will be lost since that data is not replicated and is being recovered in thisprocess from the nethost6. License the system.7. DO NOT REBOOT. This prevents Picture Perfect from starting up and attempting to connectto the micro controllers.8. Perform a database cleanup to remove old host records and make sure the id of the systemconfiguration record is correct. Use the following steps:a. Set Picture Perfect profile:. /cas/bin/profileb. Start up the database by running the command:su - ppadmin -c oninitc. Remove all host records by running the command:/cas/bin/sqlstmt "DELETE FROM host"d. Reset system the config record id to 1:/cas/bin/sqlstmt "UPDATE system_config SET id = 1"e. Stop the database by running the command:su - ppadmin -c "onmode -ky"9. Perform the optional package installation (subhost, impexp, image), restore the database(s)where applicable, and reboot the server when requested.Follow the instructions in Picture Perfect 4.6 Installation Manual, Chapter 6, “InstallingPicture Perfect 4.6”, section “Installing optional packages and interfaces".10. DO NOT REBOOT. This prevents Picture Perfect from starting up and attempting to connectto the micro controllers.Note:Before proceeding with the next section to configure the new subhost into the system, check for primary keyconditions using the following command: /cas/er/bin/chkpk.shIf any issues are detected, contact UTC Fire & Security Customer Support.
- Page 1: Picture Perfect 4.6 Enterprise Edit
- Page 5 and 6: iiiChapter 6. Troubleshooting and s
- Page 7 and 8: iPrefaceThis document is designed t
- Page 9 and 10: Chapter 1 Enterprise system overvie
- Page 11 and 12: Chapter 1Enterprise system overview
- Page 13 and 14: Chapter 2 Installing the Picture Pe
- Page 15 and 16: Chapter 2Installing the Picture Per
- Page 17 and 18: Chapter 2Installing the Picture Per
- Page 19 and 20: Chapter 2Installing the Picture Per
- Page 21 and 22: Chapter 2Installing the Picture Per
- Page 23 and 24: Chapter 2Installing the Picture Per
- Page 25 and 26: Chapter 2Installing the Picture Per
- Page 27 and 28: Chapter 2Installing the Picture Per
- Page 29 and 30: Chapter 2Installing the Picture Per
- Page 31 and 32: Chapter 2Installing the Picture Per
- Page 34 and 35: 26Picture Perfect 4.6 Enterprise Ed
- Page 36 and 37: 28Picture Perfect 4.6 Enterprise Ed
- Page 38 and 39: 30Picture Perfect 4.6 Enterprise Ed
- Page 40 and 41: 32Picture Perfect 4.6 Enterprise Ed
- Page 42 and 43: 34Picture Perfect 4.6 Enterprise Ed
- Page 44 and 45: 36Picture Perfect 4.6 Enterprise Ed
- Page 48 and 49: 40Picture Perfect 4.6 Enterprise Ed
- Page 50 and 51: 42Picture Perfect 4.6 Enterprise Ed
- Page 52 and 53: 44Picture Perfect 4.6 Enterprise Ed
- Page 54 and 55: 46Picture Perfect 4.6 Enterprise Ed
- Page 56 and 57: 48Picture Perfect 4.6 Enterprise Ed
- Page 58 and 59: 50Picture Perfect 4.6 Enterprise Ed
- Page 60 and 61: 52Picture Perfect 4.6 Enterprise Ed
- Page 62 and 63: 54Picture Perfect 4.6 Enterprise Ed
- Page 64 and 65: 56Picture Perfect 4.6 Enterprise Ed
- Page 66 and 67: 58Picture Perfect 4.6 Enterprise Ed
- Page 68 and 69: 60Picture Perfect 4.6 Enterprise Ed
- Page 70 and 71: 62Picture Perfect 4.6 Enterprise Ed
- Page 72 and 73: 64Picture Perfect 4.6 Enterprise Ed
- Page 74 and 75: 66Picture Perfect 4.6 Enterprise Ed
- Page 76 and 77: 68Picture Perfect 4.6 Enterprise Ed
- Page 78 and 79: 70Picture Perfect 4.6 Enterprise Ed
- Page 80 and 81: 72Picture Perfect 4.6 Enterprise Ed
- Page 82 and 83: 74Picture Perfect 4.6 Enterprise Ed
- Page 84 and 85: 76Picture Perfect 4.6 Enterprise Ed
- Page 86 and 87: 78Picture Perfect 4.6 Enterprise Ed
- Page 88 and 89: 80Picture Perfect 4.6 Enterprise Ed
- Page 90 and 91: 82Picture Perfect 4.6 Enterprise Ed
- Page 92 and 93: 84Picture Perfect 4.6 Enterprise Ed
- Page 94 and 95: 86Picture Perfect 4.6 Enterprise Ed
38<strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> <strong>Enterprise</strong> <strong>Edition</strong><strong>User</strong> <strong>Manual</strong>e. Perform the optional package installation (netlan, impexp, image), restore thedatabase(s) where applicable, and reboot the server when requested.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> 4.0 Installation <strong>Manual</strong>, Chapter 6, “Installing<strong>Picture</strong> <strong>Perfect</strong>”, section “Installing optional packages and interfaces".f. Execute the database conversion and follow instructions to perform a backup for thetarget-converted database.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 3, “Runningthe conversion utility”.g. Back up the converted database as required by the conversion utility (two copiesrecommended).IMPORTANT: If this is a subhost with high-level latency (>150 ms, overseas server),perform an additional backup of the converted base database only to a separate file.To perform an additional backup for only the converted base database, please followthe steps below from the command line:• Login into a terminal session and login as ppadmin.• Set <strong>Picture</strong> <strong>Perfect</strong> profile by running:. /cas/bin/profile• Start up the database by running:oninit• Perform the converted database backup by running:cba -c -b -v -d -baseNote:This will create a backup o the converted base database to the file named in thecommand. Use that backup during the installation of the subhost with high-level network latency.h. Transfer the converted database file to a safe place (PC or the target server), since thecurrent server could be used for other conversions.C.2 <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> server installation1. Log in to the target server.2. Install the OS (AIX or Linux).Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 4 or 5,depending on your server type (AIX or Linux).3. Prepare the server for <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> (phase 2).Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 6, “Installing<strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong>”, section “Running the pre-installation setup".4. Find out if the customer requires installing IT security/OS hardening tools and proceedaccordingly.5. Perform the <strong>Picture</strong> <strong>Perfect</strong> base package installation.