13.07.2015 Views

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

Picture Perfect 4.6 Enterprise Edition User Manual - UTCFS Global ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3Upgrading <strong>Picture</strong> <strong>Perfect</strong> version 4.0/4.5.1 to <strong>4.6</strong>3310. DO NOT REBOOT. This prevents <strong>Picture</strong> <strong>Perfect</strong> from starting up and attempting to connectto the micro controllers.Note:Before proceeding with the next section to configure the new subhost into the system, check for primary keyconditions using the following command: /cas/er/bin/chkpk.shIf any issues are detected, contact UTC Fire & Security Customer Support.D. Configuring the system1. Add the target <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> subhost to the system.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> <strong>Enterprise</strong> <strong>Edition</strong> <strong>User</strong> <strong>Manual</strong>, Chapter 2,“Installing the network host”, section "Update the host table on the nethost with subhostinformation”.Note:Make sure the subhost to configure at this time has <strong>Picture</strong> <strong>Perfect</strong> stopped as well, if not, please log into that server and stop it.2. From the command line, initiate the final configuration process by running hostconfig.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> <strong>Enterprise</strong> <strong>Edition</strong> <strong>User</strong> <strong>Manual</strong>, Chapter 2,“Configuring the system to recognize the subhosts”.Note:This process can take several minutes, and in some cases, depending on database size and server toserver network latency, it can take hours to finish. Therefore, we recommend running hostconfig from aconsole or a session that ensures it will not be stopped at any time.3. If re-using the same PP 4.0 server to do the PP <strong>4.6</strong> upgrade, this step does not apply.Perform the Backup > History archive to Disk File task and then repeat the same scenariowith Force Roll Over option into another file to capture all existing history data.Follow the instructions in <strong>Picture</strong> <strong>Perfect</strong> <strong>4.6</strong> Installation <strong>Manual</strong>, Chapter 3, “Backing updatabase, configuration, and custom files”, section “Archiving history and forcing rolloversection".4. Start <strong>Picture</strong> <strong>Perfect</strong> in the target subhost <strong>4.6</strong> server. Run the following command:su - ppadmin -c rc.pperf5. If the host IP address is different from the original PP 4.0 subhost IP, update the micros withthis information. Bring micros online few at the time.6. Repeat the steps in sections C.1, C.2, and C.3 for the next subhost to be configured.7. Once all servers are configured, start <strong>Picture</strong> <strong>Perfect</strong> on the nethost.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!