13.07.2015 Views

GAIL (India) Limited

GAIL (India) Limited

GAIL (India) Limited

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8919. LIST OF APPROVED MAKES/AGENCY OF MATERIALS(For Sanitary work)The following guidelines are to be noted with regard to use of materials in the work.1 As far as possible, materials bearing "Standard Mark (ISI)" from Bureau of <strong>India</strong>n Standard (BIS) shallbe used in the work, unless make is specifically mentioned in Schedule of rate/ scope.2 Wherever, material bearing Standard Mark (ISI) are used the work, the following shall be ensured.a) The supplier has a valid license from BIS during the period the material is being used in the work.b) The Contractor should furnish necessary documents and proof of payments made for the procurementof materials bearing Standard Mark (ISI).3. Due to non-availability of materials bearing ISI mark as detailed in para-2 above, the materials as perthe list of approved makes of materials shall be used in the work and the Contractor can use any ofmakes given in the attached list.4. In case it is established that Standard material (bearing ISI mark) as well as the materials indicated inthe list (as mentioned in the above para) are not available in the market, then approved equivalentmaterials may be used in the work subject to approval from the consultant and Engineer-in-Charge.5. For materials bearing "Standard Mark (ISI)" ordinarily no testing is to be done. However, in case ofdoubt or with a view to check the quality of materials, Engineer-in-Charge may send samples forrandom testing.6. For use of materials other than materials bearing "Standard Mark (ISI)" Mandatory tests shall beconducted at the frequency specified in the contract. In case frequency of testing is not stipulated in thecontract then standard specification (CPWD, ISI etc.) may be considered for frequency at whichmaterials are to be tested.7. Before bulk purchase of quantities of materials, it is the responsibility of the Contractor to getthe samples of materials approved from consultant and Engineer-in-Charge

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!