6918. TECHNICAL SPECIFICATIONSOFSANITARY AND PLUMBING WORKS
70SPECIFICATIONSPLUMBING AND SANITARY WORKSCONTENTS- General- Scope of Work- Samples Material DrawingsWATER SUPPLY- Scope of Work- Materials- Cutting, Laying & Jointing of Pipes & Fittings- Clamps & Holder Bats- Testing- Internal Work- Water Supply fittings- Scope of Sewerage Disposal and DrainageSANITARY INSTALLATION- General Requirements- Sanitary Wares- Toilet Requisites- PVC Pipes and FittingsEXTERNAL SEWARAGEEXTERNAL WATER SUPPLY
- Page 19 and 20: 183.13 DurabilityThe durability of
- Page 21 and 22: 203.18.5 Accuracy of BatchingThe ac
- Page 23 and 24: 22placement of concrete, the surfac
- Page 25 and 26: 24ii)iii)In framing the beam at dif
- Page 27 and 28: 262. Test for organic impurities.3.
- Page 29 and 30: 28The minimum interval between the
- Page 31 and 32: 303.30.3 Limitation to Use of Diffe
- Page 33 and 34: 32The joint filler shall be easily
- Page 35 and 36: 341 kg 1 No. 100 gms 1 No.3. Slump
- Page 37 and 38: 36It shall be ensured that the bars
- Page 39 and 40: 385.1.2 RELATED WORK SPECIFIED ELSE
- Page 41 and 42: 40Oiling shall be done before reinf
- Page 43 and 44: 42For fair faced concrete, the posi
- Page 45 and 46: 446.3 RUBBLE MASONRY:-6.3.1. MATERI
- Page 47 and 48: 467.1.1.2 Hard Wood:Hard wood shall
- Page 49 and 50: 48The glass sheets for glazing shal
- Page 51 and 52: 50finish with minimum anodic film t
- Page 53 and 54: 52The tiles shall generally conform
- Page 55 and 56: 54Plaster as herein specified shall
- Page 57 and 58: 5612.9.5 FLOATING COAT OF NEAT CEME
- Page 59 and 60: 5813.1.a3 Preparation of Surface:Th
- Page 61 and 62: 6014.1.2 Preparation of surface:Pre
- Page 63 and 64: 62solution generously with brush. A
- Page 65 and 66: 64The Gypsum boards used for false
- Page 67 and 68: 661.4.1 Straining posts shall be pr
- Page 69: 687 Aluminum glazing section Hindal
- Page 73 and 74: 722.6 For all pipes, work shall be
- Page 75 and 76: 743.6 As far as possible no GI pipe
- Page 77 and 78: 76Following measures shall be adopt
- Page 79 and 80: 781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82: 803.16 Cast iron gratings shall be
- Page 83 and 84: 82a) The contractor shall at all ti
- Page 85 and 86: 844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88: 865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
70SPECIFICATIONSPLUMBING AND SANITARY WORKSCONTENTS- General- Scope of Work- Samples Material DrawingsWATER SUPPLY- Scope of Work- Materials- Cutting, Laying & Jointing of Pipes & Fittings- Clamps & Holder Bats- Testing- Internal Work- Water Supply fittings- Scope of Sewerage Disposal and DrainageSANITARY INSTALLATION- General Requirements- Sanitary Wares- Toilet Requisites- PVC Pipes and FittingsEXTERNAL SEWARAGEEXTERNAL WATER SUPPLY