3S.NO.CONTENTSPAGENOS14 SPECIFICATIONS FOR ACRYLIC EMULSION PAINTINGS 5915 SPECIFICATIONS FOR FALSE CEILING 6216 SPECIFICATIONS FOR CHAINLINK FENCING 6517 LIST OF APPROVED MAKE (CIVIL) 6718 SPECIFICATIONS FOR PLUMBING & SANITARY WORKS 6919 LIST OF APPROVED MAKE (SANITARY) 89II SPECIFICATION FOR ELECTRICAL 1TECHNICAL CONDITIONS 2CHAPTER-1 – INTERNAL WIRING 5CHAPTER-2 – POWER CONTROL CENTRES / POWERDISTRIBUTION BOARDS / MOTOR CONTROL CENTRES.9CHAPTER-3 – LAYING OF CABLES 16CHAPTER-4 – EARTHING 19CHAPTER-5 – SUB – STATION 21CHAPTER-6 – LIGHTING PROTECTION 25RECOMMENDED MAKES OF MATERIALS 29III SPECIFICAITON FOR AIR-CONDITIONING SYSTEM 1IV SPECIFICATION FOR INTERIOR WORKS 1V LIST OF MANDATORY TESTS 1VI LIST OF DOCUMENTS / REGISTERS TO BE MAINTAINED 1VII TENTATIVE QUANTITIES 1
41.1 GENERAL:A. GENERAL INFORMATIONThe work under this tender shall be executed strictly in accordance with constructional and materialrequirements defined under these specifications. The Contractor shall carefully acquaint himself withthese specifications to determine his contractual obligations for the work. The conditions of thesespecifications will be binding on the Contractor and no deviation shall be permissible unless specificallyapproved by the Consultant / Engineer-in-charge in writing. In absence of any detailed specificationsthese specification, latest Indian Standard specifications and code of practice shall become applicable.Wherever the codes and specifications are silent then the same shall be governed by sound engineeringpractices and the decision of the Engineer-in-charge / Consultant in matters of interpretation etc., shall befinal and binding on the Contractor.1.2 DRAWINGS / DIMENSIONS:Figured dimensions on drawings shall supersede measurements by scale and drawings to a large scale takeprecedence over those to a smaller scale. Special dimensions or directions in the specifications shall bechecked on site. The dimensions where stated do not allow for wastage, laps joints etc., the levels.Measurements and other information concerning the existing site on the drawings are believed to becorrect, but the Contractor shall verify them for himself and also examine the nature of the ground as noclaim or allowance whatsoever shall be entertained hereinafter on account of any errors or omissions inthe levels or the description of the ground turning out to be different from what was expected or shown onthe drawings.1.3 CORRELATION OF DRAWING:Before commencement of work, the Contractor shall correlate all relevant structural, Construction andservices drawings and satisfy himself that the information available is complete and unambiguous. TheContractor shall be responsible for any error / difficulty in execution / damage incurred owing to anydiscrepancy in the drawings which has been overlooked by him and has not been brought to the notice ofthe Engineer-in-charge / Consultant before execution.1.4 B.I.S CODES OF PRACTICE:Wherever any reference is made in the specifications to any bureau of Indian Standard (IS) code ofpractice, it shall be understood to indicate the latest version of the code of practice in usage at the time ofconstruction.1.5 ALL SIMILAR RATES TO HAVE SAME QUOTED RATEIt shall be noted by the bidder that a similar item repeated at various sub heads of the tender, he shouldquote same rates. For any reasons different rates are quoted the lowest rate shall be considered forderiving the substituted / extra item rate if required.1.6. ASSESSMENT OF QUANTITIES IN LUMPSUM PARTThe quantities of the lump sum section of the tender (given in Vol-III part-A) are indicative only for thereference of the bidders. However, the bidders are advised to make their own assessment of the quantitiesbased on the drawings and scope of work to arrive for the exact quantities. GAIL shall not be responsiblefor any omissions / errors made by the bidder in assessment of the actual quantities required for theexecution of the lumpsum section of the job. Extra claims on account of the error made by the bidder inassessment of the true quantities of the items of work shall not be entertained whatsoever.1.7. VARIATION IN LUMPSUM PARTFor any variation in the quantities of any item in Lumpsum section due to site conditions orotherwise upto and including + 1% (taken all together) the quoted rate shall remain firm. Beyond, thislimit if there is any variation during the execution of works the same may be worked out for payment /recovery as per the extra / substituted item clause of Special Conditions of Contract.
- Page 1 and 2: 0GAIL (India) Limited(A Nav Ratna C
- Page 3: 2S.NO.TECHNICAL SPECIFICATIONSINDEX
- Page 7 and 8: 6SPECIFICATIONS1. SPECIFICATIONS FO
- Page 9 and 10: 81.8 DE-WATERINGWork for excavation
- Page 11 and 12: 102.9 TREATEMENT OF SOIL ALONG EXTE
- Page 13 and 14: 123.3 PLANT AND EQUIPMENTThe contra
- Page 15 and 16: 143.6.3 WATERWater used in the work
- Page 17 and 18: 16Unless otherwise specified in the
- Page 19 and 20: 183.13 DurabilityThe durability of
- Page 21 and 22: 203.18.5 Accuracy of BatchingThe ac
- Page 23 and 24: 22placement of concrete, the surfac
- Page 25 and 26: 24ii)iii)In framing the beam at dif
- Page 27 and 28: 262. Test for organic impurities.3.
- Page 29 and 30: 28The minimum interval between the
- Page 31 and 32: 303.30.3 Limitation to Use of Diffe
- Page 33 and 34: 32The joint filler shall be easily
- Page 35 and 36: 341 kg 1 No. 100 gms 1 No.3. Slump
- Page 37 and 38: 36It shall be ensured that the bars
- Page 39 and 40: 385.1.2 RELATED WORK SPECIFIED ELSE
- Page 41 and 42: 40Oiling shall be done before reinf
- Page 43 and 44: 42For fair faced concrete, the posi
- Page 45 and 46: 446.3 RUBBLE MASONRY:-6.3.1. MATERI
- Page 47 and 48: 467.1.1.2 Hard Wood:Hard wood shall
- Page 49 and 50: 48The glass sheets for glazing shal
- Page 51 and 52: 50finish with minimum anodic film t
- Page 53 and 54: 52The tiles shall generally conform
3S.NO.CONTENTSPAGENOS14 SPECIFICATIONS FOR ACRYLIC EMULSION PAINTINGS 5915 SPECIFICATIONS FOR FALSE CEILING 6216 SPECIFICATIONS FOR CHAINLINK FENCING 6517 LIST OF APPROVED MAKE (CIVIL) 6718 SPECIFICATIONS FOR PLUMBING & SANITARY WORKS 6919 LIST OF APPROVED MAKE (SANITARY) 89II SPECIFICATION FOR ELECTRICAL 1TECHNICAL CONDITIONS 2CHAPTER-1 – INTERNAL WIRING 5CHAPTER-2 – POWER CONTROL CENTRES / POWERDISTRIBUTION BOARDS / MOTOR CONTROL CENTRES.9CHAPTER-3 – LAYING OF CABLES 16CHAPTER-4 – EARTHING 19CHAPTER-5 – SUB – STATION 21CHAPTER-6 – LIGHTING PROTECTION 25RECOMMENDED MAKES OF MATERIALS 29III SPECIFICAITON FOR AIR-CONDITIONING SYSTEM 1IV SPECIFICATION FOR INTERIOR WORKS 1V LIST OF MANDATORY TESTS 1VI LIST OF DOCUMENTS / REGISTERS TO BE MAINTAINED 1VII TENTATIVE QUANTITIES 1