333.34 SUPERVISIONAll concreting work shall be done under strict supervision of the qualified and experienced representativesof the Contractor as well as those of the Consultant The contractor’s Engineer and supervisor who are inchargeof concreting work shall be skilled in this class of work and shall personally supervise all theconcreting operations.Special attention shall be paid to the following:-(a)(b)(c)(d)Proportioning, mixing and quality testing of the materials with particular control on the watercement ratio.Laying of material in place and thorough compaction of the concrete to ensure solidity andfreedom from voids and honey combing.Proper curing for the requisite period.Reinforcement and inserts/embodiments position are not disturbed during concreting andconsolidation by vibration.3.35 QUALITY CONTROLThe Consultant/Engineer-in-charge reserves the right to make changes in the mix proportions includingthe increased cement content or/and a change in the Contractor’s control procedure, should the qualitycontrol during progress of the works prove to be inadequate in his opinion.All the concrete work shall be true to level, plumb and square within the acceptable tolerance.corners, edges and rises in all cases shall be unbroken and finished properly and carefully.The3.36 TOLERANCESThe acceptable tolerances for formed concrete surfaces shall be given below: -a) Variation from plumb for -i. Columns and walls to be rendered 6 mm in 3 metersii. Exposed columns and walls 3 mm in 3 metersb) Variation in cross sectional dimensions of columns and beams and in the thickness of slabs andwalls: - 6 mm & + 12 mmAll the works executed beyond the tolerance limits are liable to be rejected and no extra cost shall be paidto the contractor for reconstructing the same as desired by the Consultant/Engineer-in-charge.3.37 TESTING ROOMA testing room of not less than 10 sqm equipped with the following apparatus and qualified concretetechnician, labour and materials required for carrying out tests therein shall be provided by the contractorat his own cost:1. Sieve Set (For aggregate 20 mm down)40 mm, 20 mm, 16 mm, 12.5 mm, 10 mm, 4.75 mm, 600 micron, 300 micron, and 75 micron havingdiameter of 45 cms.2. Weighinga) Physical balance cap. 200 gms with weigh box (accuracy 0.5 gm)b) Counter Scale cap 20 Kgc) Weights5 kg 1 No 500 gms 1 No.2 kg 2 Nos. 200 gms 1 No.
341 kg 1 No. 100 gms 1 No.3. Slump Cones 2 Nos4. 15 cms moulds 18 no.5. Electric/Kerosene Heater6. pans etc. as directed by the Consultant7. Measuring Cylinders of 1000 ml., 500 ml and 100ml.8. Wash bottles of the Capacity of 500 ml., 2 Nos.9. Sink10. Work benches, shelves, desks and any other furniture and lighting as required by the Consultant.11. Spring balance dial type cap. 100 kg12. Litre measuresa) 10 Lit 1 No.b) 5 Lit 1 No.c) 2 Lit 2 Nosd) 1 Lit 1 No.e) 1/2 Lit 1 No.13. Cube Testing Machine 100 Tons.14. Oven.15. Cores/ Apparatus for conducting Proctor Density Tests.3.38 CO-ORDINATION OF WORKThe contractor is fully responsible for coordinating with the other agencies for sanitary, electrical work,etc. to ensure execution of their work related to commencement of concreting. Nothing extra shall bepayable to the contractor, if the works pertaining to concreting have to be dismantled and redone due tolack of co-ordination on the part of the contractor in ensuring completion of works of such agenciesbefore concreting had been undertaken.4 SPECIFICATIONS FOR STEEL REINFORCEMENT4.1 GENERAL4.1.1 DESCRIPTIONThis section covers the requirements for fabricating, delivering and placing of steel reinforcement inposition for casting all types of concrete work4.1.2 RELATED WORK SPECIFIED ELSEWHEREApplicable Codes and Standards:The codes and standards generally applicable to the work this section is listed in this section.IS: 280IS: 432IS: 456IS: 1139IS: 1566IS: 2502Mild wire for general engineering purposePart I Mild steel and medium tensile steel barsPart II Hard drawn steel wireCode of practice for plain and reinforced concreteHot rolled mild steel, medium tensile steel and high yield strength steel deformed barsfor concrete reinforcementHard drawn steel wire fabric for concrete reinforcementCode of Practice for bending and fixing of bars for concrete reinforcementThe following clauses are intended to amplify the requirements of the reference documents listed aboveand the contractor/Engineer-in-charge shall comply with these clauses.
- Page 1 and 2: 0GAIL (India) Limited(A Nav Ratna C
- Page 3 and 4: 2S.NO.TECHNICAL SPECIFICATIONSINDEX
- Page 5 and 6: 41.1 GENERAL:A. GENERAL INFORMATION
- Page 7 and 8: 6SPECIFICATIONS1. SPECIFICATIONS FO
- Page 9 and 10: 81.8 DE-WATERINGWork for excavation
- Page 11 and 12: 102.9 TREATEMENT OF SOIL ALONG EXTE
- Page 13 and 14: 123.3 PLANT AND EQUIPMENTThe contra
- Page 15 and 16: 143.6.3 WATERWater used in the work
- Page 17 and 18: 16Unless otherwise specified in the
- Page 19 and 20: 183.13 DurabilityThe durability of
- Page 21 and 22: 203.18.5 Accuracy of BatchingThe ac
- Page 23 and 24: 22placement of concrete, the surfac
- Page 25 and 26: 24ii)iii)In framing the beam at dif
- Page 27 and 28: 262. Test for organic impurities.3.
- Page 29 and 30: 28The minimum interval between the
- Page 31 and 32: 303.30.3 Limitation to Use of Diffe
- Page 33: 32The joint filler shall be easily
- Page 37 and 38: 36It shall be ensured that the bars
- Page 39 and 40: 385.1.2 RELATED WORK SPECIFIED ELSE
- Page 41 and 42: 40Oiling shall be done before reinf
- Page 43 and 44: 42For fair faced concrete, the posi
- Page 45 and 46: 446.3 RUBBLE MASONRY:-6.3.1. MATERI
- Page 47 and 48: 467.1.1.2 Hard Wood:Hard wood shall
- Page 49 and 50: 48The glass sheets for glazing shal
- Page 51 and 52: 50finish with minimum anodic film t
- Page 53 and 54: 52The tiles shall generally conform
- Page 55 and 56: 54Plaster as herein specified shall
- Page 57 and 58: 5612.9.5 FLOATING COAT OF NEAT CEME
- Page 59 and 60: 5813.1.a3 Preparation of Surface:Th
- Page 61 and 62: 6014.1.2 Preparation of surface:Pre
- Page 63 and 64: 62solution generously with brush. A
- Page 65 and 66: 64The Gypsum boards used for false
- Page 67 and 68: 661.4.1 Straining posts shall be pr
- Page 69 and 70: 687 Aluminum glazing section Hindal
- Page 71 and 72: 70SPECIFICATIONSPLUMBING AND SANITA
- Page 73 and 74: 722.6 For all pipes, work shall be
- Page 75 and 76: 743.6 As far as possible no GI pipe
- Page 77 and 78: 76Following measures shall be adopt
- Page 79 and 80: 781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82: 803.16 Cast iron gratings shall be
- Page 83 and 84: 82a) The contractor shall at all ti
333.34 SUPERVISIONAll concreting work shall be done under strict supervision of the qualified and experienced representativesof the Contractor as well as those of the Consultant The contractor’s Engineer and supervisor who are inchargeof concreting work shall be skilled in this class of work and shall personally supervise all theconcreting operations.Special attention shall be paid to the following:-(a)(b)(c)(d)Proportioning, mixing and quality testing of the materials with particular control on the watercement ratio.Laying of material in place and thorough compaction of the concrete to ensure solidity andfreedom from voids and honey combing.Proper curing for the requisite period.Reinforcement and inserts/embodiments position are not disturbed during concreting andconsolidation by vibration.3.35 QUALITY CONTROLThe Consultant/Engineer-in-charge reserves the right to make changes in the mix proportions includingthe increased cement content or/and a change in the Contractor’s control procedure, should the qualitycontrol during progress of the works prove to be inadequate in his opinion.All the concrete work shall be true to level, plumb and square within the acceptable tolerance.corners, edges and rises in all cases shall be unbroken and finished properly and carefully.The3.36 TOLERANCESThe acceptable tolerances for formed concrete surfaces shall be given below: -a) Variation from plumb for -i. Columns and walls to be rendered 6 mm in 3 metersii. Exposed columns and walls 3 mm in 3 metersb) Variation in cross sectional dimensions of columns and beams and in the thickness of slabs andwalls: - 6 mm & + 12 mmAll the works executed beyond the tolerance limits are liable to be rejected and no extra cost shall be paidto the contractor for reconstructing the same as desired by the Consultant/Engineer-in-charge.3.37 TESTING ROOMA testing room of not less than 10 sqm equipped with the following apparatus and qualified concretetechnician, labour and materials required for carrying out tests therein shall be provided by the contractorat his own cost:1. Sieve Set (For aggregate 20 mm down)40 mm, 20 mm, 16 mm, 12.5 mm, 10 mm, 4.75 mm, 600 micron, 300 micron, and 75 micron havingdiameter of 45 cms.2. Weighinga) Physical balance cap. 200 gms with weigh box (accuracy 0.5 gm)b) Counter Scale cap 20 Kgc) Weights5 kg 1 No 500 gms 1 No.2 kg 2 Nos. 200 gms 1 No.