- Page 1: 0GAIL (India) Limited(A Nav Ratna C
- Page 5 and 6: 41.1 GENERAL:A. GENERAL INFORMATION
- Page 7 and 8: 6SPECIFICATIONS1. SPECIFICATIONS FO
- Page 9 and 10: 81.8 DE-WATERINGWork for excavation
- Page 11 and 12: 102.9 TREATEMENT OF SOIL ALONG EXTE
- Page 13 and 14: 123.3 PLANT AND EQUIPMENTThe contra
- Page 15 and 16: 143.6.3 WATERWater used in the work
- Page 17 and 18: 16Unless otherwise specified in the
- Page 19 and 20: 183.13 DurabilityThe durability of
- Page 21 and 22: 203.18.5 Accuracy of BatchingThe ac
- Page 23 and 24: 22placement of concrete, the surfac
- Page 25 and 26: 24ii)iii)In framing the beam at dif
- Page 27 and 28: 262. Test for organic impurities.3.
- Page 29 and 30: 28The minimum interval between the
- Page 31 and 32: 303.30.3 Limitation to Use of Diffe
- Page 33 and 34: 32The joint filler shall be easily
- Page 35 and 36: 341 kg 1 No. 100 gms 1 No.3. Slump
- Page 37 and 38: 36It shall be ensured that the bars
- Page 39 and 40: 385.1.2 RELATED WORK SPECIFIED ELSE
- Page 41 and 42: 40Oiling shall be done before reinf
- Page 43 and 44: 42For fair faced concrete, the posi
- Page 45 and 46: 446.3 RUBBLE MASONRY:-6.3.1. MATERI
- Page 47 and 48: 467.1.1.2 Hard Wood:Hard wood shall
- Page 49 and 50: 48The glass sheets for glazing shal
- Page 51 and 52: 50finish with minimum anodic film t
- Page 53 and 54:
52The tiles shall generally conform
- Page 55 and 56:
54Plaster as herein specified shall
- Page 57 and 58:
5612.9.5 FLOATING COAT OF NEAT CEME
- Page 59 and 60:
5813.1.a3 Preparation of Surface:Th
- Page 61 and 62:
6014.1.2 Preparation of surface:Pre
- Page 63 and 64:
62solution generously with brush. A
- Page 65 and 66:
64The Gypsum boards used for false
- Page 67 and 68:
661.4.1 Straining posts shall be pr
- Page 69 and 70:
687 Aluminum glazing section Hindal
- Page 71 and 72:
70SPECIFICATIONSPLUMBING AND SANITA
- Page 73 and 74:
722.6 For all pipes, work shall be
- Page 75 and 76:
743.6 As far as possible no GI pipe
- Page 77 and 78:
76Following measures shall be adopt
- Page 79 and 80:
781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82:
803.16 Cast iron gratings shall be
- Page 83 and 84:
82a) The contractor shall at all ti
- Page 85 and 86:
844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88:
865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90:
88e) Location of all manholes, catc
- Page 91 and 92:
90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94:
2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96:
411. Qualified Competent Supervisio
- Page 97 and 98:
6Ceiling rose: a) A ceiling rose or
- Page 99 and 100:
8The consuming device circuit shall
- Page 101 and 102:
10A cover plate at the top of the v
- Page 103 and 104:
12Mechanical operation indicators s
- Page 105 and 106:
1411. Indicating lamps and push but
- Page 107 and 108:
16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110:
183.5.4 Provision shall be made to
- Page 111 and 112:
20such that it shall be able to rea
- Page 113 and 114:
22ii) Tappings : OFF load tap chang
- Page 115 and 116:
245.3.2 Installation: The transform
- Page 117 and 118:
26A vertical air termination shall
- Page 119 and 120:
286. Testing:On the completion of t
- Page 121 and 122:
30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124:
2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126:
47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128:
6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130:
8ii.iii.iv.All necessary allowances
- Page 131 and 132:
10ACTUATOR:In case of motorised smo
- Page 133 and 134:
12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136:
14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138:
162.0 INSULATIONManufacturer Materi
- Page 139 and 140:
0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142:
1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144:
316. Unless otherwise provided spec
- Page 145 and 146:
52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148:
7All joinery to be varnished/spirit
- Page 149 and 150:
9b) After the first coat has fully
- Page 151 and 152:
11b) The Contractor should furnish
- Page 153:
13holes, loose or dead knots or oth
- Page 156 and 157:
2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159:
4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161:
6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163:
8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165:
10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168:
1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170:
The following are the tentative qua
- Page 171 and 172:
S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174:
S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175 and 176:
CONNECTING CORRIDORS.No DESCRIPTION