GAIL (India) Limited
GAIL (India) Limited GAIL (India) Limited
EXTERNAL STAIRCASES.No DESCRIPTION OF WORK UNIT QTY1 Earth work excavation in all types of soils.a) 0.00 to 1.50 m 6.72 Cumb 1.50 to 3.00 m 4.05 Cum2 Transportation of excavated earth. 6.80 Cum3 Backfilling to the excavated earth. 4.00 Cum4 Providing PCC 1:4:8 as levelling course under foundations, flooring. 0.50 Cum5 RR masonry in foundation, plinth & in basement in CM 1:6 prop. 0.00 Cum6 Providing & laying of Cast in situ RCC 1:1.5:3 incl. ShutteringBottom raft, walls, slab upto plinth level5.04 Cum7 Reinforcement steel for RCC Works. 410.00 Kgs8Fabrication and erection of MS emergency staircase including structural steel material asper drawing.4.00 M.T.9 Providing & fixing of M.S. Pipe railing for external staircase. 50.00 Sqm8
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175: CONNECTING CORRIDORS.No DESCRIPTION
EXTERNAL STAIRCASES.No DESCRIPTION OF WORK UNIT QTY1 Earth work excavation in all types of soils.a) 0.00 to 1.50 m 6.72 Cumb 1.50 to 3.00 m 4.05 Cum2 Transportation of excavated earth. 6.80 Cum3 Backfilling to the excavated earth. 4.00 Cum4 Providing PCC 1:4:8 as levelling course under foundations, flooring. 0.50 Cum5 RR masonry in foundation, plinth & in basement in CM 1:6 prop. 0.00 Cum6 Providing & laying of Cast in situ RCC 1:1.5:3 incl. ShutteringBottom raft, walls, slab upto plinth level5.04 Cum7 Reinforcement steel for RCC Works. 410.00 Kgs8Fabrication and erection of MS emergency staircase including structural steel material asper drawing.4.00 M.T.9 Providing & fixing of M.S. Pipe railing for external staircase. 50.00 Sqm8