1VI. LIST OF DOCUMENTS/REGISTERS TO BE MAINTAINED AT SITEFOR ENSURING PROPER QUALITY CONTROL OF WORK IN PROGRESS1. A complete set of Contract Documents.2. A complete set of drawings (Tender drawings and Good for Execution Drawings).3. A complete set of change in specification or scope if any.4. Material Test Register (Master Register) indicating details of various other TestRegisters.5. Cement Test Register.6. Aggregates Test Registeri) Fine aggregate-sandii)Coarse aggregate7. Cube Test Register8. Register for anti-termite material used in the work.9. Register for bricks testing. .10. Bar bending schedule Register/Pour Cards.11. Concrete Pouring Register.12. Paint Test Register.13. Register for approval of samples for various materials.14. Site Order Book.15. Register showing use of non specified materials and reasons thereof.16. Hindrance Register17. Cement & steel consumption register.18. Levels-Record registers (for earth filling, roadwork).19. Daily records pertaining to labour deployment.20. Records for all the deviations during the execution of work to be maintained.
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 168 and 169: 221. Records for bitumen consumptio
- Page 170 and 171: S.No DESCRIPTION OF WORK UNIT QTY10
- Page 172 and 173: OFFICE BUILDING - FIRST FLOORS.No D
- Page 174 and 175: OFFICE BUILDING INTERNAL WORKS - PL
- Page 176: EXTERNAL STAIRCASES.No DESCRIPTION
1VI. LIST OF DOCUMENTS/REGISTERS TO BE MAINTAINED AT SITEFOR ENSURING PROPER QUALITY CONTROL OF WORK IN PROGRESS1. A complete set of Contract Documents.2. A complete set of drawings (Tender drawings and Good for Execution Drawings).3. A complete set of change in specification or scope if any.4. Material Test Register (Master Register) indicating details of various other TestRegisters.5. Cement Test Register.6. Aggregates Test Registeri) Fine aggregate-sandii)Coarse aggregate7. Cube Test Register8. Register for anti-termite material used in the work.9. Register for bricks testing. .10. Bar bending schedule Register/Pour Cards.11. Concrete Pouring Register.12. Paint Test Register.13. Register for approval of samples for various materials.14. Site Order Book.15. Register showing use of non specified materials and reasons thereof.16. Hindrance Register17. Cement & steel consumption register.18. Levels-Record registers (for earth filling, roadwork).19. Daily records pertaining to labour deployment.20. Records for all the deviations during the execution of work to be maintained.