0GAIL (India) Limited(A Nav Ratna C
- Page 3 and 4:
2S.NO.TECHNICAL SPECIFICATIONSINDEX
- Page 5 and 6:
41.1 GENERAL:A. GENERAL INFORMATION
- Page 7 and 8:
6SPECIFICATIONS1. SPECIFICATIONS FO
- Page 9 and 10:
81.8 DE-WATERINGWork for excavation
- Page 11 and 12:
102.9 TREATEMENT OF SOIL ALONG EXTE
- Page 13 and 14:
123.3 PLANT AND EQUIPMENTThe contra
- Page 15 and 16:
143.6.3 WATERWater used in the work
- Page 17 and 18:
16Unless otherwise specified in the
- Page 19 and 20:
183.13 DurabilityThe durability of
- Page 21 and 22:
203.18.5 Accuracy of BatchingThe ac
- Page 23 and 24:
22placement of concrete, the surfac
- Page 25 and 26:
24ii)iii)In framing the beam at dif
- Page 27 and 28:
262. Test for organic impurities.3.
- Page 29 and 30:
28The minimum interval between the
- Page 31 and 32:
303.30.3 Limitation to Use of Diffe
- Page 33 and 34:
32The joint filler shall be easily
- Page 35 and 36:
341 kg 1 No. 100 gms 1 No.3. Slump
- Page 37 and 38:
36It shall be ensured that the bars
- Page 39 and 40:
385.1.2 RELATED WORK SPECIFIED ELSE
- Page 41 and 42:
40Oiling shall be done before reinf
- Page 43 and 44:
42For fair faced concrete, the posi
- Page 45 and 46:
446.3 RUBBLE MASONRY:-6.3.1. MATERI
- Page 47 and 48:
467.1.1.2 Hard Wood:Hard wood shall
- Page 49 and 50:
48The glass sheets for glazing shal
- Page 51 and 52:
50finish with minimum anodic film t
- Page 53 and 54:
52The tiles shall generally conform
- Page 55 and 56:
54Plaster as herein specified shall
- Page 57 and 58:
5612.9.5 FLOATING COAT OF NEAT CEME
- Page 59 and 60:
5813.1.a3 Preparation of Surface:Th
- Page 61 and 62:
6014.1.2 Preparation of surface:Pre
- Page 63 and 64:
62solution generously with brush. A
- Page 65 and 66:
64The Gypsum boards used for false
- Page 67 and 68:
661.4.1 Straining posts shall be pr
- Page 69 and 70:
687 Aluminum glazing section Hindal
- Page 71 and 72:
70SPECIFICATIONSPLUMBING AND SANITA
- Page 73 and 74:
722.6 For all pipes, work shall be
- Page 75 and 76:
743.6 As far as possible no GI pipe
- Page 77 and 78:
76Following measures shall be adopt
- Page 79 and 80:
781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82:
803.16 Cast iron gratings shall be
- Page 83 and 84:
82a) The contractor shall at all ti
- Page 85 and 86:
844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88:
865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90:
88e) Location of all manholes, catc
- Page 91 and 92:
90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94:
2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96:
411. Qualified Competent Supervisio
- Page 97 and 98:
6Ceiling rose: a) A ceiling rose or
- Page 99 and 100:
8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151: 11b) The Contractor should furnish
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175 and 176: CONNECTING CORRIDORS.No DESCRIPTION