13.07.2015 Views

GAIL (India) Limited

GAIL (India) Limited

GAIL (India) Limited

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4II.TECHNICAL SPECIFICATION FOR INTERIOR WORKS1. For all detailing please refer drawings in Volume-IV. All exposed wooden surface shall be polishedwith first grade melamine polish of matching colour shade unless mentioned otherwise in drawingsand or in specifications.2. FURNITURE AND FURNISHINGS2.1 SCOPE OF WORK.The interior works comprising of furniture, furnishing fixtures/fittings for OFFICE BUILDING OF M/s. <strong>GAIL</strong>(INDIA) LIMITED AT VISAKHAPATNAM, A.P.All the works, as per the drawings shall be earned out strictly as per the specifications mentioned herein. In theabsence of any materials, relevant C.P.W.D. specifications of latest editions (with corrections upto date) shall bestrictly followed and in case any materials is not covered up in the above specifications, relevant latest IS Codesshall be followed.The conditions of these specifications shall be binding on the Contractor No deviation shall be permissible unlessspecifically approved by the Engineer-in-Charge2.2 DRAWINGS & DOCUMENTSDrawings are indicative only and shall not be scaled Figured dimensions shall be strictly followed, large-scaledrawings/ details shall supercede small scale drawingsThe contractor shall be fully responsible for any error, difficulty in execution/damage incurred owing todiscrepancy in drawings which has been overlooked by him and has not been brought to the notice of Engineerin-Chargeetc2.3 GENERAL REQUIREMENTSThis section of the specification shall be read in conjunction with the drawings and other contract documents andother section of this specification, which shall be deemed to the complimentary of one carpentry and joinery, andpainting sections. The Contractor carrying out this work shall be responsible for providing all plants tools,materials and all things necessary for the proper execution, completion and maintenance of these works.2.4 SAMPLESA sample of every item of furniture, including its parts shall be submitted for approval before an order is placedor manufacture commences Approved samples shall be used as standards of finish and workmanship.2.5 TIMBERTimber shall be of the species indicated on detailed drawings or as specified. It shall be the best of its kind, as setout in section of Carpentry and Joinery, well seasoned or kiln dried with a moisture content of 12% nominal Itshall be matched for colour and graining, free from worm holes, large loose or dead knots or other defects andsawn die square, Timber which is completely hidden by upholstery material shall be as specified on drawings.2.6 DELETED2.7 TEAK WOODIt shall be 2nd class <strong>India</strong>n teakwood such as Ballarshah Malabar and Dandles The timber shall have uniformcolor straight grained and free from knots, cracks, shakes sapwood etc.2.8 SAMPLES & SHOP DRAWINGSThe contractor shall before proceeding with the work, submit to the Engineer-in-Charge complete samples of thevarious materials including hardware and fastening all devices and shop drawings and large scale detailscovering all joinery work The final procurement and works shall be carried out in accordance with the samplesduly approved by Engineer-in-Charge.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!