1S . NO ITEM ACCEPTABLE MAKES1.0 MACHINES1.1 Air Cooled Package Units Blue Star, Batliboi, LG, CarrierAircon, ETA, Voltas, Hitachi,Diakin & Mitsubushi1.2 Split AC units Blue Star, Batliboi, LG, CarrierAircon, ETA, Voltas, HitachiDiakin & MitsubushiAlsthom2.0.2.1VENTILATION/EXHAUST FANPropeller Fans2.2 Inline, Centrifugal Fans Nicotra, Caryaire, Kanalflakt3.0 DUCTING & ACCESSORIES: Tata/HSL/SAIL3.1 G.I. Sheets3.2 Aluminium Grilles, Diffusers, LinearGrillesCaryaire, Ravistar, Air master,Airtech3.3 MS Grilles, Diffusers Caryaire, Ravistar, Air master4.04.1VALVESRefrigerant ValvesBrassomatic, Sant4.2 ' Y' Strainers Brassomatic, Sant5.0 Temp/ Pressure Gauges Taylor, Fiebig, H Guru6.0 Fire Dampers Caryaire, Air master,Ravistar, Airtech7.0 Vibration Isolators Resistoflex, Dunlop, Emerald8.0 INSULATIONS 1 Glass wool UP Twiga, Owens Coming, Kiimco8.2 Expanded Polystyrene (TF Quality) Beardscll, Lloyd Insulation9.010.0Air FiltersV belts/PulleysAerosol, Purolator, ThermadyneFenner, Dunlop11.0 Electric Motors Siemens, Kirloskar, Crompton, ABB12.0 Air Curtains Sidwal / Thermoking
1IV. TECHNICAL SPECIFICATIONSFORINTERIOR WORKS
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139: 0G) LIST OF APPROVED MAKES:The foll
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175 and 176: CONNECTING CORRIDORS.No DESCRIPTION
1IV. TECHNICAL SPECIFICATIONSFORINTERIOR WORKS