GAIL (India) Limited
GAIL (India) Limited GAIL (India) Limited
15f) Refrigerantg) Nominal Air Quantity (Cfm )h) Compressorsi) Type of compressor1. Type of Starter2. Starting Current3. Running Currentj) Blower Size Motor HPk) CondenserNo. of Fans & Fans Size Air Qty of each fan MotorHPl) No. of Rows Evaporator / Condensersm) Face Area Evaporator / Condensersn) External S.Por Evaporator fan (mm WG)o) Indoor Unit Dimensions outdoor Unit Dimensionsi) Length (mm) i) Length (mm)ii) Depth (mm).ii) Depth (mm).iii) Height (mm).iii) Height (mm).p) Control Panel & Accessories/Control schemes proposed(Brief note with special featuresshall be attached)
162.0 INSULATIONManufacturer Materials DensityMean 'K' value at 50°C3.0 CONTROLS:RefrigerantManufacturerCapacityConnection size4.0 PROPFXLER FANa) Makeb) Modelc) Fan dia (mm)d) CapacityStatic Pressure (mm Wg)0 Power requirement (KW)g) Power Supply (1 ph/3 ph)DuctingAcoustic lining7.0 DAMPERS Fire DampersVolume Control Dampers(Make & Test certificates patternsto be submitted)8.0 GRELLES/DIFFUSERSLouveres(Make, Material & Guage)Grilles(Make, Material & Guage)
- Page 85 and 86: 844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88: 865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175 and 176: CONNECTING CORRIDORS.No DESCRIPTION
162.0 INSULATIONManufacturer Materials DensityMean 'K' value at 50°C3.0 CONTROLS:RefrigerantManufacturerCapacityConnection size4.0 PROPFXLER FANa) Makeb) Modelc) Fan dia (mm)d) CapacityStatic Pressure (mm Wg)0 Power requirement (KW)g) Power Supply (1 ph/3 ph)DuctingAcoustic lining7.0 DAMPERS Fire DampersVolume Control Dampers(Make & Test certificates patternsto be submitted)8.0 GRELLES/DIFFUSERSLouveres(Make, Material & Guage)Grilles(Make, Material & Guage)