GAIL (India) Limited
GAIL (India) Limited GAIL (India) Limited
1111.0 LINEAR DIFFUSER ;Liner diffuser shall be extruded aluminium construction multislot type with air patterncontrolled provided in each slot. Supply air diffusion shall be provided with volumedamper in each slot of the supply air diffuser. Plenum shall be provided for each supply airdiffuser.The Material of Grilles shall be as follows:i. Al1 grilles shall be selected in consultation with the Architect/Consultant.Different spaces shall require horizontal or vertical face bars, and different width of marginframes.ii.iii.iv.All grilles shall have a soft, continuous rubber gasket between the periphery of theregisters and the surface on which it has to be mounted. The effective area of the registersshall not be less than 75 percent.Grilles shall be adjustable pattern as each grille bar shall be pivotable to providepattern with 0 to 100 deg horizontal arc and upto 30 deg C deflection up or down Barsshall hold deflection settings under all conditions of velocity and pressure. Extrudedaluminium grilles shall have fixed bars.Bars longer than 45cm shall be reinforced by set-back vertical members of approvedthickness.The material thickness of grills, diffuser, damper shall be as follows :Diffuser MS Aluminiuma) Frame 20 gauge 18 gaugeb) Louvers 20 gauge 18 gaugeGrills:a) Frame Louv 20 gauge 26 gau 18 gauge 24 gb)V.C. Damper :a) Frame 20 gauge 1 8 gaugeb) Louver 26 gauge 24 gaugev. Fresh air intake and Extract louvers:All the louvers shall be rain protection type and shall be fabricated from extrudedaluminium section. The louvers shall additionally be provided with heavy duty expandedmetal (aluminium - alloy) bird screen.12.0 TESTING & BALANCING:After the installation of the entire air distribution system is completed in all respects, allducts shall be tested for air leaks before painting the interiors of conditioned spaces airdistribution system shall be allowed to run continuously for 48 hours for driving awayany dust or forein material logged within ducts during installation.
12D) THERMAL/ACOUSTIC INSULATION. GENERAL:Scope of this specification comprises of supplying, installing, testing and commissioningof insulation on duct, pumps, chilled water piping, chillers, expansion tank, AHU roomand duct lining.1.0 DUCT INSULATION:Resin bonded, glass wool, prelaminated with aluminium foil. The thermal conductivityof glass wool shall not exceed 0.024 Kcal/hr sqm deg C (0.19 BTU in/Hr Sq ft deg F at10 deg C - mean temperature and density shall not be less than 48 kg/m3.1.1 Thickness of Insulation:a. For Duct passing through return air areas = 25mmb. For Duct passing through non air conditioned space = 50mmc. Treated fresh air duct = 50mmd. For exposed duct = 50mm1 2 Application: (For unexposed duct)- Clean the surface of duct and apply coal of Black Japan paint of approvedmake applied @ 7 Sq mt./Kg.- Fix the insulation material of required thickness before adhesive dries up. Alllongitudinal joint will have an over lap of minimum 50 mm followed bycovering firmly by 75 mm width aluminium sticking tape to seal all transverse& longitudinal joints.Where the duct is exposed to atmosphere material shall be same as for ducts not exposed toatmosphere but without aluminium foilApplication: (For exposed duct)a. Cleaning the surface of ducts with wire brush to remove dirt, rust etc.b. Applying a coat of adhesive.c. Fixing the glass wool insulation and tied with PVC strap of 25mm widthd. Cover the insulation with fire retardant quality polythene lined hessian of 500gand seal the joint with black Japane. Fixing 24 x 3/4" Hexagonal wire netting tied with G.I. wire.f Finally applying sand cement plaster in ratio 1:3 in two layers each 10mmthick.g. Paint it to required colour with brush.
- Page 81 and 82: 803.16 Cast iron gratings shall be
- Page 83 and 84: 82a) The contractor shall at all ti
- Page 85 and 86: 844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88: 865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131: 10ACTUATOR:In case of motorised smo
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
- Page 175 and 176: CONNECTING CORRIDORS.No DESCRIPTION
1111.0 LINEAR DIFFUSER ;Liner diffuser shall be extruded aluminium construction multislot type with air patterncontrolled provided in each slot. Supply air diffusion shall be provided with volumedamper in each slot of the supply air diffuser. Plenum shall be provided for each supply airdiffuser.The Material of Grilles shall be as follows:i. Al1 grilles shall be selected in consultation with the Architect/Consultant.Different spaces shall require horizontal or vertical face bars, and different width of marginframes.ii.iii.iv.All grilles shall have a soft, continuous rubber gasket between the periphery of theregisters and the surface on which it has to be mounted. The effective area of the registersshall not be less than 75 percent.Grilles shall be adjustable pattern as each grille bar shall be pivotable to providepattern with 0 to 100 deg horizontal arc and upto 30 deg C deflection up or down Barsshall hold deflection settings under all conditions of velocity and pressure. Extrudedaluminium grilles shall have fixed bars.Bars longer than 45cm shall be reinforced by set-back vertical members of approvedthickness.The material thickness of grills, diffuser, damper shall be as follows :Diffuser MS Aluminiuma) Frame 20 gauge 18 gaugeb) Louvers 20 gauge 18 gaugeGrills:a) Frame Louv 20 gauge 26 gau 18 gauge 24 gb)V.C. Damper :a) Frame 20 gauge 1 8 gaugeb) Louver 26 gauge 24 gaugev. Fresh air intake and Extract louvers:All the louvers shall be rain protection type and shall be fabricated from extrudedaluminium section. The louvers shall additionally be provided with heavy duty expandedmetal (aluminium - alloy) bird screen.12.0 TESTING & BALANCING:After the installation of the entire air distribution system is completed in all respects, allducts shall be tested for air leaks before painting the interiors of conditioned spaces airdistribution system shall be allowed to run continuously for 48 hours for driving awayany dust or forein material logged within ducts during installation.