GAIL (India) Limited
GAIL (India) Limited GAIL (India) Limited
3All the equipment shall be thoroughly tested and checked for leaks. All safety controlsshall be suitably set and a record of all setting shall be furnished to the Engineer incharge.4.0 SPLIT UNITS:Air cooled split unit shall be as per approved make, energy efficient scroll hermitically orsemi-hermitically compressor complete with vibration isolators & factory installedcontrols (like HP & LP cutouts, inter locking Fan & Compressor, Thermostat withselector switch etc) & accessories including wiring. Efficient cooling coil shall beselected for low velocity with 3/8"/1/2" OD copper tubing having extended aluminiumfins. Hydraulic expansion of tubes assures tight bonding between tubes & fins for highheat transfer. Tubes shall be arranged in a staggered design for best air contact thusgiving low bypass. The cooling coil circuits are fed with liquid refrigerant through thethermostatic expansion valve and a distributor. Blower of an evaporating unit shall bestatically and dynamically balanced and shall be selected to give required airflow asidentified in the drawings. Filters shall be minimum 25mm thick synthetic type orequivalent wire aluminium frame. Drain pan shall be of 18 gauges insulated withexpanded polyethylene sheet. Casing shall be heavy gauge factory painted to providebetter protection against rusting.Remote air cooled condensing unit shall have to be most efficient condenser coilsmade out of copper tubing with extended aluminium fins. Tubes shall be arranged in astaggered design for better efficiency. Condenser fans shall be selected to operatequietly for required CFM to keep condensing temperature low. The compressor may bein the indoor unit or with the outdoor unit, but, it should be capable of operatingcontinuously even at high ambient of 46 deg C (115 deg F). The condensing unit shall beinstalled with M.S. base frame, alongwith cushy foot mounting vibration isolation pads.Bolted and clamped with the system. The compressor for 1.5 & 2 Tr units shall behermetically sealed Rotary/Reciprocating.Interconnected refrigerant piping between outdoor unit & indoor unit shall be of heavygauge copper complete with thermostatic expansion valve, liquid line strainer, drier, shutoff valves, high & low pressure gauges including insulated suction line. 25mm thickneoprene rubber pads shall be supplied for each indoor/outdoor units. The units shall betested in accordance with IS: 1391. The power supply shall be provided at outdoor/indoorunit as per manufacturer's requirement.5.0 TESTING:Unit capacity in tons Refrigeration, shall be computed from the temperature readings andair-flow measurements. Flow measurements shall be preferably by a hot-wireanemometer or a velometer. Computed results shall conform to the specified capacitiesand the power consumption shall conform to the figures furnished by the manufacturer.6.0 PAINTING:Shop coats of paint that have become marred during transportation or erection shall becleaned off with mineral spirits, wire brushed and spot primed over the affected areas,then coated with two coats of enamel paint to match the finish over the adjoining shoppaintedsurfaces.
47.0 CONEENSATE & DRAIN PIPING:7.1 All pipes to be used for condensate drain shall be approved make and fittings as per BIS4736 or galvanized steel class B (medium class) conforming to relevant BIS codes.7.2 All jointing in the pipe system shall be by screwed fittings using non-hardening lubricant assealing material and/or by screwed flanges using 3mm 3 ply rubber gaskets. Pipe threadsand flanges shall be as per BS 534 and BS 45047.3 All pipe supports shall be mild steel, thoroughly cleaned and given on primary coat of redoxide paint before being installed.7.4 Fittings shall be galvanized steel 'Medium Class' malleable casting of pressure ratingsuitable for the piping system. Flanges shall be of approved make. Supply of flanges shallinclude bolts, washers, gaskets as required sufficient number of flanges and unions shall beprovided for future cleaning and servicing of piping. Tee-off connections shall bethrough equal or reducing tees. All equipment and valve connections, or connections toany other mating pipe shall be through unions/screwed flanges upto 50 mm dia andthrough screwed flanges for larger diameters, or as required for the mating connections.7.5 All condensate drain piping shall be insulated as per the section 'Insulation' Cold waterpiping within the building may also be insulated.7.6 After the piping has been installed, tested and run for atleast three days of eight hourseach, all piping and pipe supports shall be painted with one coat of red oxide paint & twofinish coats of 3 mils each of approved color of synthetic enamel paint conforming to IS23797.7 The direction of flow of fluid in the pipes shall be visibly marked with identifying arrow.8.0 REFRIGERANT PIPING:a. All refrigerant pipes and fittings shall be type L' hard drawn copper tubes and wroughtcopper fitting suitable for connection with silver solder phos copper or as perManufacturers recommendations.b. All joints in copper piping shall be sweat joints using low temperature brazing and/orsilver solder. Before jointing any copper pipe or fittings, its interior shall be thoroughlycleaned be passing a clean cloth via wire or cable through its entire length. The piping shallbe continuously kept clean of dirt etc. while construction the joints. Subsequently, it shallbe thoroughly blown out using carbon-dioxide/nitrogen.c. Refrigerant lines shall be sized to limit pressure drop between evaporator andcondensing unit to less than 0.2 kg per Sq.cm.d. Removable type combination drier and filter shall be installed in liquid line of therefrigeration system incorporating a three way valve bypass. After ninety days ofoperation, liquid line drier and filter cartridges must be replaced by contractor atactual cost to be borne by owner.
- Page 73 and 74: 722.6 For all pipes, work shall be
- Page 75 and 76: 743.6 As far as possible no GI pipe
- Page 77 and 78: 76Following measures shall be adopt
- Page 79 and 80: 781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82: 803.16 Cast iron gratings shall be
- Page 83 and 84: 82a) The contractor shall at all ti
- Page 85 and 86: 844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88: 865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113 and 114: 22ii) Tappings : OFF load tap chang
- Page 115 and 116: 245.3.2 Installation: The transform
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
- Page 164 and 165: 10S.N. MATERIAL TEST FIELD/LABORATO
- Page 167 and 168: 1VI. LIST OF DOCUMENTS/REGISTERS TO
- Page 169 and 170: The following are the tentative qua
- Page 171 and 172: S.No DESCRIPTION OF WORK UNIT QTYPr
- Page 173 and 174: S.No DESCRIPTION OF WORK UNIT QTY12
3All the equipment shall be thoroughly tested and checked for leaks. All safety controlsshall be suitably set and a record of all setting shall be furnished to the Engineer incharge.4.0 SPLIT UNITS:Air cooled split unit shall be as per approved make, energy efficient scroll hermitically orsemi-hermitically compressor complete with vibration isolators & factory installedcontrols (like HP & LP cutouts, inter locking Fan & Compressor, Thermostat withselector switch etc) & accessories including wiring. Efficient cooling coil shall beselected for low velocity with 3/8"/1/2" OD copper tubing having extended aluminiumfins. Hydraulic expansion of tubes assures tight bonding between tubes & fins for highheat transfer. Tubes shall be arranged in a staggered design for best air contact thusgiving low bypass. The cooling coil circuits are fed with liquid refrigerant through thethermostatic expansion valve and a distributor. Blower of an evaporating unit shall bestatically and dynamically balanced and shall be selected to give required airflow asidentified in the drawings. Filters shall be minimum 25mm thick synthetic type orequivalent wire aluminium frame. Drain pan shall be of 18 gauges insulated withexpanded polyethylene sheet. Casing shall be heavy gauge factory painted to providebetter protection against rusting.Remote air cooled condensing unit shall have to be most efficient condenser coilsmade out of copper tubing with extended aluminium fins. Tubes shall be arranged in astaggered design for better efficiency. Condenser fans shall be selected to operatequietly for required CFM to keep condensing temperature low. The compressor may bein the indoor unit or with the outdoor unit, but, it should be capable of operatingcontinuously even at high ambient of 46 deg C (115 deg F). The condensing unit shall beinstalled with M.S. base frame, alongwith cushy foot mounting vibration isolation pads.Bolted and clamped with the system. The compressor for 1.5 & 2 Tr units shall behermetically sealed Rotary/Reciprocating.Interconnected refrigerant piping between outdoor unit & indoor unit shall be of heavygauge copper complete with thermostatic expansion valve, liquid line strainer, drier, shutoff valves, high & low pressure gauges including insulated suction line. 25mm thickneoprene rubber pads shall be supplied for each indoor/outdoor units. The units shall betested in accordance with IS: 1391. The power supply shall be provided at outdoor/indoorunit as per manufacturer's requirement.5.0 TESTING:Unit capacity in tons Refrigeration, shall be computed from the temperature readings andair-flow measurements. Flow measurements shall be preferably by a hot-wireanemometer or a velometer. Computed results shall conform to the specified capacitiesand the power consumption shall conform to the figures furnished by the manufacturer.6.0 PAINTING:Shop coats of paint that have become marred during transportation or erection shall becleaned off with mineral spirits, wire brushed and spot primed over the affected areas,then coated with two coats of enamel paint to match the finish over the adjoining shoppaintedsurfaces.