233.4 General:3.4.1 The transformer shall be guaranteed for a period of 12 months from the date of commissioning. Thecontractor shall repair/replace the damaged equipment without my extra cost.4. HT and LT cables.HT and LT cables shall be of the sizes as indicated in the schedule and schematic drawing and shall bearthe ISI mark. Laying of cables shall conform to the specification detailed in cables laying section.5. Installation, testing and commissioning of sub-station Equipment:5.1 General:The installation of various sub-station equipments shall be carried out in accordance with the workingdrawings, relevant Indian Standards, code of practice and manufacturers instruction.The installation shall be in accordance with IE rules and the regulations of either local electricity authoritywhich ever is applicable. The installation, testing and commissioning of various sub-station equipmentsshall also be carried out as per the details briefly described in the subsequent paragraphs.5.2 LT panels:5.2.1 Site inspectionThe switchboards shall be supplied by the supplier in a properly packed condition. After ascertaining thatthere is no damage to the packing, all the items shall he inspected after unpacking. It shall he ensured thatthe switch boards arc in accordance with the requirements as described in the schedule and drawings. Itshall also be ensured that all the meters, relays, indication lamps etc. are in good condition and have notsuffered any damage during transit.5.2.2 Installation: The switchboard shall be assembled together in case the switchboard is supplied insection. The switchboard shall be installed in position and levelled on the foundation as per theinstallation drawings furnished by the manufacturer. The busbar of the sections shall be properlyconnected and checked for tightness after installation. The cable termination shall be carried out inaccordance with the relevant standards and the cable end box shall be sealed. The switch board shall beearthed by means of two independent earth strips of sizes as indicated in the working drawn in theschedule. It shall be ensured that 15mm thick rubber matting of an approved make is provided in front ofthe full length of the switch board. The width of the matting shall be 1 000 mm and shall withstand 1500V for one minute.5.2.3 Testing and commissioning: The following tests shall be carried out on the switchboards at thesight prior to commissioning:i) Insulation resistance between phases and individual phase and earthii) DI-electric strength of circuit breaker oil shall be checked in accordance with relevant ISiii) Earth continuityiv) Earth Resistancev) All protective relays and tripping mechanism shall be checked for their proper operation5.3 Transformer:5.3.1 Site Inspection: The transformer shall be inspected at site to ascertain that there is no damage to any ofthe components and accessories of the transformer. Normally inspection manual will be supplied by themanufacturer. The instruction given in the instruction manual shall be followed.
245.3.2 Installation: The transformer shall be installed as per the installation manual provided by thetransformer manufacturer. The installation shall also conform to the relevant IS and IE rules. After thecompletion of the erection of the transformer it shall be ensured that the transformer wheels are suitablylocked to prevent accidental movement of transformer. HT and LT cabling LT bus duct shall be earnedout as detailed in the schedule and working drawing. The transformer neutral and body shall be earthed asdetailed in the drawing. The breather shall be cleaned and filled with oil and silica gel.5.3.3 Testing and commissioning: The following test shall be conducted on the transformer prior iscommissioning:i) Insulating resistance of the winding between phases and between individual phases and earth on both HVand LV sides and also between HV and LV windingsii) Winding resistanceiii) Di-electric strength of transformer oiliv) Voltage ratio test at all tap positionsv) Polarity testAfter commissioning of the transformer, the MV sides voltage shall be measured at different tap positions.The transformer shall be kept on no load for 24 hours, and shall be ascertained that there is no unduetemperature rise before loading the transformer.
- Page 63 and 64: 62solution generously with brush. A
- Page 65 and 66: 64The Gypsum boards used for false
- Page 67 and 68: 661.4.1 Straining posts shall be pr
- Page 69 and 70: 687 Aluminum glazing section Hindal
- Page 71 and 72: 70SPECIFICATIONSPLUMBING AND SANITA
- Page 73 and 74: 722.6 For all pipes, work shall be
- Page 75 and 76: 743.6 As far as possible no GI pipe
- Page 77 and 78: 76Following measures shall be adopt
- Page 79 and 80: 781.15 ANGLE VALVEAngle valve shall
- Page 81 and 82: 803.16 Cast iron gratings shall be
- Page 83 and 84: 82a) The contractor shall at all ti
- Page 85 and 86: 844.5.1 LEADING IN C.I. PIPESThe le
- Page 87 and 88: 865.2.4 TRENCH FILLING OF G.I. PIPE
- Page 89 and 90: 88e) Location of all manholes, catc
- Page 91 and 92: 90Sr.No. MATERIALS APPROVED MAKE/AG
- Page 93 and 94: 2TECHNICAL CONDITIONS1.1 These spec
- Page 95 and 96: 411. Qualified Competent Supervisio
- Page 97 and 98: 6Ceiling rose: a) A ceiling rose or
- Page 99 and 100: 8The consuming device circuit shall
- Page 101 and 102: 10A cover plate at the top of the v
- Page 103 and 104: 12Mechanical operation indicators s
- Page 105 and 106: 1411. Indicating lamps and push but
- Page 107 and 108: 16CHAPTER 31. Scope:LAYING OF CABLE
- Page 109 and 110: 183.5.4 Provision shall be made to
- Page 111 and 112: 20such that it shall be able to rea
- Page 113: 22ii) Tappings : OFF load tap chang
- Page 117 and 118: 26A vertical air termination shall
- Page 119 and 120: 286. Testing:On the completion of t
- Page 121 and 122: 30l. Light Switches/Sockets/Fan Reg
- Page 123 and 124: 2TECHNICAL SPECIFICATIONSA) AIR COO
- Page 125 and 126: 47.0 CONEENSATE & DRAIN PIPING:7.1
- Page 127 and 128: 6B) AIR DISTRIBUTION SYSTEM:1.0 GEN
- Page 129 and 130: 8ii.iii.iv.All necessary allowances
- Page 131 and 132: 10ACTUATOR:In case of motorised smo
- Page 133 and 134: 12D) THERMAL/ACOUSTIC INSULATION. G
- Page 135 and 136: 14BASIS OF DESIGNAC REQUIRED FOROFF
- Page 137 and 138: 162.0 INSULATIONManufacturer Materi
- Page 139 and 140: 0G) LIST OF APPROVED MAKES:The foll
- Page 141 and 142: 1IV. TECHNICAL SPECIFICATIONSFORINT
- Page 143 and 144: 316. Unless otherwise provided spec
- Page 145 and 146: 52.9 ROUGH CARPENTRYMaterialAll fra
- Page 147 and 148: 7All joinery to be varnished/spirit
- Page 149 and 150: 9b) After the first coat has fully
- Page 151 and 152: 11b) The Contractor should furnish
- Page 153: 13holes, loose or dead knots or oth
- Page 156 and 157: 2S.N. MATERIAL TEST FIELD/LABORATOR
- Page 158 and 159: 4S.N. MATERIAL TEST FIELD/LABORATOR
- Page 160 and 161: 6S.M. MATERIAL TEST FIELD/LABORATOR
- Page 162 and 163: 8S.N. MATERIAL TEST FIELD/LABORATOR
233.4 General:3.4.1 The transformer shall be guaranteed for a period of 12 months from the date of commissioning. Thecontractor shall repair/replace the damaged equipment without my extra cost.4. HT and LT cables.HT and LT cables shall be of the sizes as indicated in the schedule and schematic drawing and shall bearthe ISI mark. Laying of cables shall conform to the specification detailed in cables laying section.5. Installation, testing and commissioning of sub-station Equipment:5.1 General:The installation of various sub-station equipments shall be carried out in accordance with the workingdrawings, relevant <strong>India</strong>n Standards, code of practice and manufacturers instruction.The installation shall be in accordance with IE rules and the regulations of either local electricity authoritywhich ever is applicable. The installation, testing and commissioning of various sub-station equipmentsshall also be carried out as per the details briefly described in the subsequent paragraphs.5.2 LT panels:5.2.1 Site inspectionThe switchboards shall be supplied by the supplier in a properly packed condition. After ascertaining thatthere is no damage to the packing, all the items shall he inspected after unpacking. It shall he ensured thatthe switch boards arc in accordance with the requirements as described in the schedule and drawings. Itshall also be ensured that all the meters, relays, indication lamps etc. are in good condition and have notsuffered any damage during transit.5.2.2 Installation: The switchboard shall be assembled together in case the switchboard is supplied insection. The switchboard shall be installed in position and levelled on the foundation as per theinstallation drawings furnished by the manufacturer. The busbar of the sections shall be properlyconnected and checked for tightness after installation. The cable termination shall be carried out inaccordance with the relevant standards and the cable end box shall be sealed. The switch board shall beearthed by means of two independent earth strips of sizes as indicated in the working drawn in theschedule. It shall be ensured that 15mm thick rubber matting of an approved make is provided in front ofthe full length of the switch board. The width of the matting shall be 1 000 mm and shall withstand 1500V for one minute.5.2.3 Testing and commissioning: The following tests shall be carried out on the switchboards at thesight prior to commissioning:i) Insulation resistance between phases and individual phase and earthii) DI-electric strength of circuit breaker oil shall be checked in accordance with relevant ISiii) Earth continuityiv) Earth Resistancev) All protective relays and tripping mechanism shall be checked for their proper operation5.3 Transformer:5.3.1 Site Inspection: The transformer shall be inspected at site to ascertain that there is no damage to any ofthe components and accessories of the transformer. Normally inspection manual will be supplied by themanufacturer. The instruction given in the instruction manual shall be followed.