13.07.2015 Views

Oct 2012-Mar 2013 - IMFA

Oct 2012-Mar 2013 - IMFA

Oct 2012-Mar 2013 - IMFA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

: 6 :Compliance : Comprising statement showing details of production, waste handling/development as per the Approved Scheme of Mining Vs Actual is as follows.Year<strong>Oct</strong>'12 to<strong>Mar</strong>ch'13Actual achieved(as per MiningScheme)Proposed (as perMining Scheme)<strong>2012</strong>-13 RemarksAchieved (as perMining Scheme) ason 31.03.<strong>2013</strong>Ore in M.T. 22115.000 MT 1,20,000 22115.000 MTOverburden/Waste inCum.1877.960 M 3 8332 1877.960 M 3Production & OB excavation isless due to the miningoperation was kept inabeyance from17.02.<strong>2012</strong>('C' shift) to06.01.<strong>2013</strong> as per directivesfrom the Collector & DistrictMagistrate, Keonjhar.(iii)Condition :For ambient air quality monitoring stations should be established in the corezone as well as the buffer zone for RPM, SPM, SO2, Nox and CO monitoring. Locationof stations should be decided based on the meteorological data, topographical featuresand environmentally and ecologically sensitive targets in consultation with the StatePollution Control Board.Data in ambient air quality (RPM,SPM,SO2,NOx & CO) should be regularly submittedto the Ministry including its regional office at Bhubaneswar and the State PollutionControl Board/Central Pollution Control Board once in six months.Compliance : Ambient air quality monitoring station has already been established inboth core & buffer zone in consultation with the State Pollution Control Board and themonitoring is being carried out by the authorised agency M/s-Environmental Researchand Services (Indian) Pvt. Ltd, BBSR in seasonal wise. The monitoring reports arebeing submitted to MoEF and OSPCB regularly.(iv)Condition :Drill should wet operated or with dust extractors and control blasting shouldbe practiced.Compliance : Wet drilling is being carried out. Control blasting technique is alsoadopted.(v)Condition :Fugitive dust emissions from all the sources should be controlled regularlymonitored and data recorded properly. Water spraying arrangements on haul roads,wagon loading, dumpers/trucks, loading and unloading points should be provided andmaintained.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!