13.07.2015 Views

Oct 2012-Mar 2013 - IMFA

Oct 2012-Mar 2013 - IMFA

Oct 2012-Mar 2013 - IMFA

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Season of <strong>2012</strong>-13: 4 :Water Depth From Surface ofBore Well No.1(in Mtr)Water Depth From Surface ofBore Well No.3(in Mtr.)Post-Monsoon 10.97 15.44Winter 12.65 18.42(ix)Condition :The project authorities should meet water requirement of the peripheralvillage(s), especially, if the village wells go dry due to mine de-watering.Compliance : No such case has been reported as on date. In case the village wells godry the water requirement shall be made by the project authority.(x)Condition :Mine water discharge and/or any waste water containing Cr +6 should beproperly treated to meet the prescribed standards before reuse/discharge.Surface Run-off from the OB dumps & other surface run-off should be continuouslymonitored and analysed for Cr+6 and in case its concentration is found higher than thepermissible limit, the water should be treated before discharge/re-use.Compliance : The mine water and other surface run-off water etc. are being analysedregularly and found free from Cr +6 . Hence no treatment has been necessitated.(xi)Condition :Vehicular emissions should be kept under control and regularly monitored.Compliance : Being maintained and monitored.(xii)Condition :Recommendations made by the Central Mining Research Institute in theirstudy report on dump slopes stabilisation should be implemented.Compliance : As per the EIA & EMP, we have closed the Opencast operation from2005-06. Only operation activity is going on for back filling of old Opencast pits.(xiii)Condition :“Consent to Operate” should be obtained from SPCB before re-startingmining activities.Compliance : Consent to Operate of Air & Water has been obtained from OPCB videletter No.1778/IND-I-CON-256 Dtd.04.02.<strong>2012</strong>, valid up to 31.03.2014.(xiv)Condition :A detailed mine de-commissioning plan should be submitted to the Ministryof Environment & Forests five years in advance for approval.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!