13.07.2015 Views

mCq pCO - Standard + Heat Pump - McQuay

mCq pCO - Standard + Heat Pump - McQuay

mCq pCO - Standard + Heat Pump - McQuay

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Conditioning: <strong>pCO</strong> <strong>Standard</strong> chiller + heat pump User Guide ver. 2.9 02/11/99- max. duration of the cycle.When the defrosting cycle begins, the following conditions will occur:- the compressor stops;- reversing cycle valve energizes;- low pressure pressurestat bypassed during the entire defrosting cycle;- all fans relative to the circuit undergoing the defrosting cycle will be stopped- the compressor starts again.When the defrosting cycle is over:- the compressor stops;- the reversing cycle valve energizes;- the low pressure pressurestat will resume its control action;- the fans will start again- the compressor starts again.Simultaneous defrosting cyclesThe two circuits will undergo a defrosting cycle simultaneously as soon as the temperaturemeasured by one of the two probes falls below the start-defrosting set-point for a 't' timedepending on the time-delay before defrosting previously selected by the User.The defrosting cycle will end when the temperature rises above the selected end-defrosting setpoint.Two situations can occur:- the temperature of one of the two circuits rises above the end-defrosting set-point: in this casethe compressor of that circuit is forced into a stand-by mode until the defrosting cycle of theother circuit ends.- the temperature of one of the two circuits is above the end-defrosting set-point; in this caseonly one circuit will undergo the defrosting procedure. Should the temperature of the firstcircuit fall below the end-defrosting set-point, the defrosting cycle will not take place and therelative compressor will remain in a stand-by mode until the other active defrosting cycle (thatof the second circuit) ends.Defrost procedure activate is signaled on display’s principal mask through the followingsimbols:* Defrosting procedure active on 1° circuit** Defrosting procedure active on 2° circuitElectropumpThe electropump functioning is prior to any other device.The pump is forced into the On status as soon as the unit is switched on.The pump will then be stopped a certain 't' time after the unit has been switched off (selectabletime-interval before stopping the pump).In the event of pump lockout due to alarm conditions, the unit is forced into the Off status; thecompressors will perform the PUMP-DOWN procedure - if previously selected - otherwise theywill be stopped in the usual way.Pag.29/61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!