13.07.2015 Views

addendum-2 - Madhya Pradesh Road Development Corporation ...

addendum-2 - Madhya Pradesh Road Development Corporation ...

addendum-2 - Madhya Pradesh Road Development Corporation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M.P. ROAD DEVELOPMENT CORPORATION LIMITED Clarifications on the Queries for Architectural, Design and PMC Services for Construction of <strong>Madhya</strong>lok, Mumbai NIT No. MPRDClProcu.IPMCl<strong>Madhya</strong>lokl15312012/5793 ,Date: 08/0812012Sn. I Clause Description Query of the Bidder Reply of MPRDCNo.1 Clause Supervise & approve the As per this clause the consultant have to inspect and3.C setting up of laboratory approve Laboratory set up by Contractor at Site.Quality (including calibration of Please Clarify the meaning of "Consultant shouldControl, equipment's) and field also undertake at least 100% of the total test by Consultant has to get conducted 100% of field testSection- tests carried out by the himself' do we have to retest the Contractors in their presence.5, TOR Contractor. results. Please see Addendum.Consultant should also undertake at least 100% of the total test by himself. 2 Clause- Time Schedule During IPlease Clarify whether this schedule is for Design The Time Schedule is for Planning, Construction5.0 Construction Phase Phase or both the Phases (Design and Construction Phase and after completion of Project.Section- Supervision phase) Please see Addendum.5, TOR3 Clause- I Terms of Payment As per this clause the payment term defined here are I Payment terms define in clause 9.1 is for Planning9.0 for both the phase mention in previous point. Stage, Part of which (Sn. VI to VIII) will be paidSection-during construction and after completion.5, TOR4 Clause- ITerms of Payment Please clarify point vn of payment schedule I Yes.9.1 which is on completion of Item No. 5.1.06 = 5% Section- which shall be paid during (Construction S, TOR Management and superVISIon by deploying necessary technical manpower to ensure plannedprogress)This means that 5% of fee shall be paid duringconstruction supervision.>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!