13.07.2015 Views

FY2006/07 to FY2008/09 - Department of Defence

FY2006/07 to FY2008/09 - Department of Defence

FY2006/07 to FY2008/09 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

chapter 11RISKS AND MITIGATING ACTIONSThe main risks confronting Joint Support remain related<strong>to</strong> maintenance and repair <strong>of</strong> facilities, vehicles andequipment, as well as the skill and experience level <strong>of</strong>personnel. The risk <strong>of</strong> unsafe and unstable ammunitionstill exists. The rate <strong>of</strong> disposal needs <strong>to</strong> be increased <strong>to</strong>substantively mitigate this risk. The establishment <strong>of</strong> anammunition disposal plant <strong>to</strong> overcome the risk is beinginvestigated. Although some additional funding <strong>to</strong> mitigatethe risk was received and steady disposal is takingplace, the risk remains at an unacceptable level. Thethreat <strong>to</strong> personal safety and loss <strong>of</strong> life and propertydue <strong>to</strong> this situation will remain the most serious risk inthe DOD. The additional funding allocated for the maintenanceand repair <strong>of</strong> facilities has also increased butremains far below the amount required <strong>to</strong> improve significantlywhat is currently a steadily declining state <strong>of</strong>facilities in the DOD. This funding will continue <strong>to</strong> beused in conjunction with the long-term programme <strong>of</strong>the National <strong>Department</strong> <strong>of</strong> Public Works <strong>to</strong> upgradeState facilities.The diversity and non-standardisation <strong>of</strong> informationtechnology systems in the DOD as part <strong>of</strong> legacy continues<strong>to</strong> be a risk. This will eventually be solved by thephased implementation <strong>of</strong> information systems thatserve the defence function and are also linked <strong>to</strong> theimplementation <strong>of</strong> the National Information andFinance Management System (IFMS), which is currentlybeing developed. In the interim, funding is directed <strong>to</strong>managing this risk, which largely entails maintenance <strong>of</strong>obsolete s<strong>of</strong>tware and hardware <strong>to</strong> the detriment <strong>of</strong>other priorities.SERVICES TO BE SCALED DOWN,SUSPENDED OR ABOLISHEDOwing <strong>to</strong> continued underfunding, the CommandManagement Information Systems (CMIS) Division willcontinue with the reduction <strong>of</strong> service levels with SITAin order <strong>to</strong> obtain products and systems support serviceswithin budget, satisfying transversal corporate prioritiesas its first commitment. The services <strong>of</strong> theInformation Communication Technology (ICT) serviceproviders will also continue <strong>to</strong> be scaled down, drivenlargely the increasing cost <strong>of</strong> goods and services universallyexperienced in the IT sec<strong>to</strong>r.Contractual obligations with regard <strong>to</strong> CMIS relatedservices <strong>to</strong> the DOD will be met, but further developmentin the IT and Internet environment will be limited.Although additional funding is still being provided forinformation technology requirements, it is insufficient <strong>to</strong>overcome the chronic backlog <strong>of</strong> services <strong>to</strong> sustain theDivisions output, with little or no funds <strong>to</strong> address criticalaspects <strong>of</strong> renewal.The Military Police Agency will provide provost pla<strong>to</strong>onsat the same level as for FY2005/06, which will betwo less than required owing <strong>to</strong> the high maintenancecosts <strong>of</strong> the Mamba vehicle, inadequate structure andshortage <strong>of</strong> funds <strong>to</strong> staff and <strong>to</strong> equip additional personnel.The Crime Administration System can still onlybe deployed in the larger MP structures and not at 19 <strong>of</strong>the smaller MP structures due <strong>to</strong> insufficient funding.PERFORMANCE AND SERVICEDELIVERY IMPROVEMENTThe activities described in the following Table are themost important in terms <strong>of</strong> improving service delivery<strong>of</strong> the Joint Support Programme during <strong>FY2006</strong>/<strong>07</strong>.They stretch over more than one year and some arealready in process. Some <strong>of</strong> the multi-year activities listedin the FY2005/06 Plan are also still in process, but arenot repeated in this table.ActivitiesPlanned Management InterventionAnticipated BenefitStatusIntegrated facility serviceImplementation <strong>of</strong> the DOD EnvironmentalManagement System [EMS]based on the principles <strong>of</strong> ISO 14000Compliance by DOD <strong>of</strong>Environmental legislationIn processIntegrated supply supportserviceEnsuring optimum efficiency <strong>of</strong> supplysupport service through the implementation<strong>of</strong> a fuel management systemExpected savings on DOD vehiclefuel billImplementedJan 06Accredited training formembers demilitarisingAccreditation and capacitating <strong>of</strong> theCentre for Advanced TrainingStudents are suitably skilledreceive portable skills ensuringgainful employmentActiveTable 11.3Joint Support Programme - Performance and Service Delivery ImprovementS T R A T E G I C B U S I N E S S P L A N F Y 2 0 0 6 / 0 7 T O 2 0 0 8 / 0 985

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!