13.07.2015 Views

FY2006/07 to FY2008/09 - Department of Defence

FY2006/07 to FY2008/09 - Department of Defence

FY2006/07 to FY2008/09 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

chapter 7ActivitiesPlanned Management InterventionAnticipated BenefitStatusCombat capability,logisticrestructuringTo implement the designed logisticsupport concept <strong>of</strong> the Hawk andGripen systems in accordance with theapproved SAAF Logistic SupportPhilosophy and the guidelines in theSAAF Strategic Transformation PlanTowards Vision 2012An optimised logistic support systemfor Hawk and Gripen systems thatreflects a cost-effective balancebetween organic SAAF logistic supportand outsourced support, thusassisting in reducing the overall cos<strong>to</strong>f supportOngoingContinuous level 6 integration activitiesfor Gripen and Hawk until 2011Ensure effective integration <strong>of</strong> SDPaircraft in<strong>to</strong> serviceTraining capability,ETD practitionertraining assessorsAcquire an internal ability <strong>to</strong> trainassessors under licence <strong>of</strong> an externalprovider150 assessors trained, qualified andcertified within 12 months50% cost saving against <strong>to</strong>tal outsourceOne-<strong>of</strong>f for2006/<strong>07</strong>Command andcontrol,communicationsReduction <strong>of</strong> the SAAF telephone billby at least 50 % through the introduction<strong>of</strong> tighter control measures andthe introduction <strong>of</strong> telephone call cardsfor private callsAdditional funds available for allocationin support <strong>of</strong> the SAAF's operationaloutputApr 06Command andcontrolClose liaison and co-operation withcivilian air traffic management serviceproviderNationally standardised air traffic managementequipment, rules and regulations,eliminating duplicationOngoingAir transportcapability, logisticoperational forumAir transportcapability, nigh<strong>to</strong>perationsSupport capabilityTo establish a forum <strong>to</strong> develop coordinatedaircraft system master plansTo expand the current night operationcapabilitiesOptimising <strong>of</strong> aviation fuelmanagement through computerisedmoni<strong>to</strong>ring systems and improved controlmeasuresThis forum will optimise the supportprovided and reduce the associatedbudget implicationsThis will increase the ability <strong>of</strong> alltransport aircraft <strong>to</strong> conduct operationalmissions at nightSubstantial increase in the ability <strong>to</strong>minimise losses and improve control<strong>of</strong> procurementTo be operationalin Mar06To be operationalby Aug06Jun 06Support capabilityIntroducing active moni<strong>to</strong>ring and controlprocesses for the procurement,disbursement and utilisation <strong>of</strong> rationsAdditional funds available for allocationin support <strong>of</strong> the SAAF's operationaloutputOngoingTable 7.4Air <strong>Defence</strong> Programme - Performance and Service Delivery Improvement (continued)60D E P A R T M E N T O F D E F E N C E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!