13.07.2015 Views

IT CHIUSURE A VOLANTINO SCHEDA TECNICA - Jurop S.p.A.

IT CHIUSURE A VOLANTINO SCHEDA TECNICA - Jurop S.p.A.

IT CHIUSURE A VOLANTINO SCHEDA TECNICA - Jurop S.p.A.

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REV. 0204-03-2014TECHNICAL DATA SHEET - HAND WHEEL CLAMPTANKTANK BOTTOMTANK END RINGTANK SEAL HOUSINGTANK BOTTOM RING3. InstallationThe manual hand wheel clamps must be welded to the tanks. The weld must be made in correspondence of the tank end ring and the wall andopen bottom ring. As for the welding method, refer to the materials indicated in Chapter 2. We recommend installing reinforcement strips incorrespondence of the supports to be welded to the tank.Before proceeding with the final weld, ensure that upon unscrewing the hand wheel, the tie rod comes out easily from the pair of supports(welded to the tank), thereby allowing to open the bottom.The following figure shows a schematic view of a possible installation.REINFORCEMENT STRIP(NOT SUPPLIED)TANK BOTTOM RINGENSURE ENOUGH SPACE TOUNLOCK THE TIE RODENSURE ENOUGH SPACE FORTURNING THE HAND WHEELOPEN BOTTOMTANK END RINGOPEN CLAMPCONFIGURATIONTo allow for easy manual activation of the clamps, during installation, it is important to leave enough space to turn the hand wheel andunlock/remove the tie rod4. GreasingTo operate correctly, the manual hand wheel clamp must undergo routine maintenance/lubrication of the threaded part of the tie rod and of thehand wheel. Grease when needed.We recommend using NLGI EP 2 lithium grease.<strong>Jurop</strong> SpAVia Crosera 5033082 Azzano Decimo, PN (Italy)3 / 4TEL. +39 0434 636811 FAX. +39 0434 636812http://www.jurop.ite-mail: info@jurop.it

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!