Exobiology in the Solar System & The Search for Life on Mars - ESA
Exobiology in the Solar System & The Search for Life on Mars - ESA
Exobiology in the Solar System & The Search for Life on Mars - ESA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SP-1231<br />
184<br />
II.7.5 A Possible<br />
<str<strong>on</strong>g>Exobiology</str<strong>on</strong>g> Experiment<br />
Package and Operat<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
Arrangement<br />
<str<strong>on</strong>g>The</str<strong>on</strong>g> previously described equipment could be distributed between a large Lander and<br />
a Rover <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> follow<str<strong>on</strong>g>in</str<strong>on</strong>g>g basis:<br />
ROVER (opti<strong>on</strong> 1)<br />
– robotic positi<strong>on</strong><str<strong>on</strong>g>in</str<strong>on</strong>g>g arm 2.0 kg<br />
– a rock surface gr<str<strong>on</strong>g>in</str<strong>on</strong>g>der 0.4 kg<br />
– low-power microscope 0.2 kg<br />
– APX spectrometer 0.5 kg<br />
– a small rock-cor<str<strong>on</strong>g>in</str<strong>on</strong>g>g drill 3.5 kg<br />
– core sample c<strong>on</strong>ta<str<strong>on</strong>g>in</str<strong>on</strong>g>ers 0.5 kg<br />
Total mass: 7.1 kg<br />
ROVER (opti<strong>on</strong> 2)<br />
– small robotic arm equipped to collect cm-sized surface rocks, place <str<strong>on</strong>g>in</str<strong>on</strong>g> transfer<br />
c<strong>on</strong>ta<str<strong>on</strong>g>in</str<strong>on</strong>g>ers, and subsequently pass to <str<strong>on</strong>g>the</str<strong>on</strong>g> Lander. (2 kg);<br />
– close-up colour camera (0.1 kg);<br />
– sample c<strong>on</strong>ta<str<strong>on</strong>g>in</str<strong>on</strong>g>ers <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> collected small rock samples (0.5 kg).<br />
LANDER<br />
– subsurface drill system 6.5 kg<br />
– sample handl<str<strong>on</strong>g>in</str<strong>on</strong>g>g/distributi<strong>on</strong> 4.0 kg<br />
– sample secti<strong>on</strong><str<strong>on</strong>g>in</str<strong>on</strong>g>g 0.3 kg<br />
– sample gr<str<strong>on</strong>g>in</str<strong>on</strong>g>d<str<strong>on</strong>g>in</str<strong>on</strong>g>g 0.4 kg<br />
– low-resoluti<strong>on</strong> microscope 0.2 kg<br />
– optical microscope 0.3 kg<br />
– Atomic Force Microscope 1.5 kg<br />
– microscopy transfer stage 1.0 kg<br />
– Alpha/Prot<strong>on</strong>/X-ray Spectrometer 0.5 kg<br />
– Mössbauer Spectrometer 0.5 kg<br />
– Laser Raman Spectrometer 1.5 kg<br />
– IR Microspectrometer 1.0 kg<br />
– Pyrolytic, Gas Chromatograph, Mass Spectrometer 5.5 kg<br />
– Oxidant detector 0.4 kg<br />
– Laser Ablati<strong>on</strong> ICP mass spectrometer 2.5 kg<br />
Total mass: 26.1 kg<br />
In this c<strong>on</strong>figurati<strong>on</strong>, <str<strong>on</strong>g>the</str<strong>on</strong>g> Lander is <str<strong>on</strong>g>the</str<strong>on</strong>g> centre <str<strong>on</strong>g>for</str<strong>on</strong>g> subsurface sampl<str<strong>on</strong>g>in</str<strong>on</strong>g>g and <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
situ sample preparati<strong>on</strong> and analysis processes. <str<strong>on</strong>g>The</str<strong>on</strong>g> Rover <str<strong>on</strong>g>the</str<strong>on</strong>g>n provides a selecti<strong>on</strong><br />
of rock samples from nearby locati<strong>on</strong>s ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r as small core samples or as small (cmsize)<br />
rocks, <str<strong>on</strong>g>for</str<strong>on</strong>g> saw<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Lander. In <str<strong>on</strong>g>the</str<strong>on</strong>g> latter case, <str<strong>on</strong>g>the</str<strong>on</strong>g> Rover may be of small<br />
dimensi<strong>on</strong>s and be equipped with a camera and close-up imag<str<strong>on</strong>g>in</str<strong>on</strong>g>g system.