LISTE DES FOYERS À VOCATION SOCIALEFOYER DU STIFT (Séminaire Protestant)1B, quai Saint-ThomasBP 8002267081 STRASBOURGTél : 03 88 25 90 25 ou 26FOYER de l’étudiant CATHOLIQUE (FEC) (garçons)17, Place St Etienne 67000 STRASBOURGTél. 03.88.35.36.20Aumônerie Universitaire Protestante7, Avenue de la Forêt Noire 67000 STRASBOURGTél. 03.88.61.07.23Grand Séminaire2, rue des Frères 67000 STRASBOURGTél. 03.88.36.03.28N° téléphone : 03 88 21 13 30FOYER Jean STURM (mixte)2a, rue Salzmann 67000 STRASBOURGTél. 03.88.15.76.00FOYER St Maurice (mixte)1, rue de Reims 67000 STRASBOURGTél. 03.88.60.00.78 – 03.88.45.09.99FJT Adoma Mâcon (Foyer du Jeune Travailleur) (mixte)24, rue de Mâcon 67100 STRASBOURGTél. 03.88.39.69.01 E-Mail : patrice.kantor@adoma.frASSOCIATION des FOYERS de l’Ill1, Place de Savoie 67300 SCHILTIGHEIMTél. 03.88.33.05.55RESIDENCE des Etudiants (mixte)2, rue Marc Séguin 67800 BISCHHEIMTél. 03.88.18.66.23RESIDENCE Jean MONNET (mixte)7, Chemin du Routoir 67400 ILLKIRCHTél. 03.88.67.10.88ASSOCIATION PARME54 rue de Ban de la Roche 67000 STRASBOURGTél. 03.88.75.46.53


CLIMATE CHANGE SCENARIOS


Durian Tunggal dam at Melaka - 1991


THEFLOOD …


HOW TO MANAGE…• Physical Means• Sociological Means• Economics Means• Network Management• Energy Management• Environmental & Resource Management


OPTIMIZATION OF WATER SUPPLY1.Network Management2.Energy Management3.Environmental & ResourceManagement


OPTIMIZATION OF WATER SUPPLY1.Network Managementa) Optimum Design limit and estimationsb) Reduce System Lossesc) Optimize Storage Tank Capacitiesd) Reduce Pumping System or boosterstations


PIPES MATERIAL SELECTION..Glass Reinforced Pipes has a “C”-value of 150 and stronger than steelpipes but yet of non-corrosive material.


OPTIMIZATION OF WATER SUPPLY2. Energy Managementa) Improve Power/Voltage Qualityb) Select Best Switching Gearsc) Retrofit with Energy-saving devices e.gVSD, Controller etcd) Select Best Efficient Motors & Pumpse) Reduce System Losses


OPTIMIZATION OF WATER SUPPLY3. Environmental & ResourcesManagementa) Retrofit with environmental-friendly devices e.g lownoisedevices.b) Select Best Design Suitability e.g less sludgetreatment, non chemical WTPc) Select Construction Plan with Low Impact onEnvironmental e.g No Dams Plan, using Natural SubstorageReservoirsd) Improve On Raw Water e.g siltation dam,Use of Riverbank Filtration System(RBF) &Horizontal Collector Well method(HCW)


Introduction to Groundwatera. Simple and cheap to treat to good drinkingwaterb. Stable quality and quantity all yearc. Localized availability, means decentralizedinfrastructure and short transmission costsd. Far better protection than surface watere. Little impact on nature and environment


Horizontal Collector Well System :a groundwater engineering applicationRefers to the one of thegroundwater <strong>system</strong>being abstracted fromaquifers in the alluviumsuch as sand and gravellayer through radial wellswhich are drilled andinstalled horizontallyinside concrete caisson.


RIVERBANK FILTRATION SYSTEM (RBF) WITHHORIZONTAL COLLECTOR WELL (HCW)RIVERGroundwater aquifer


RIVERBANK FILTRATION SYSTEM


CONSTRUCTION OF HORIZONTAL COLLECTOR WELL


ESSENTIAL BENEFIT OF HORIZONTAL COLLECTOR WELLIN RIVER INFILTRATION SYSTEM1. LARGE QUANTITIES OF WATER PRODUCED OVER SMALLCONSTRUCTION AREA2. LOW IN CONSTRUCTION COST , LESS TIME TO CONSTRUCTAND IT’S GREEN TECHNOLOGY.3. MAINTENANCE IS EASY AND ECONOMICAL WITH COSTSAVING4. PRODUCED WATER IS CLEAR AND PURE (LOW TURBIDITY)AND PROTECTED FROM OUTSIDE THREATS.5. MINERAL CONTENT (IRON & MANGANESE) OF WATER IS LOW6. WATER PRODUCTION IS GUARANTEED, ESPECIALLY DURINGDRY SEASONS


Riverbank Filtration System – AdvantagesREDUCTION ON COSTS-Operational Cost- Energy Cost- Maintenance Cost3 Aspects of Reduction:COSTSREDUCTION ON RISKS- Quality of Water- Failure on Operation- Environmental DamagesREDUCTION ON THREATS- Climate Change Impact- Pollution of River- ‘War’ on Use of WaterRISKSTHREATS


0.2933 0.2184 0.1624(-26% GW)(-45% SW)SURFACE WATER GROUNDWATER RIVER INFILTRATIONCapital Costs RM M/mld % RM M/mld % RM M/mld %General Prelimenaries 0.14 5% 0.13 5% 0.06 6%Raw Water Intake 0.27 10% 0.21 8% 0.15 16%Raw Water Pumping 0.02 1% 0.01 0% 0.01 1%Water Treatment Works 1.39 51% 1.95 74% 0.59 63%Treated Water Piping 0.58 21% 0.01 0% 0.01 1%Others 0.33 12% 0.34 13% 0.12 13%2.73 2.65 0.94(-65% GW)(-66% SW)Operating Costs RM/m 3 % RM/m 3 % RM/m 3 %Electricity 0.1447 49% 0.1322 61% 0.1008 62%Chemicals 0.0564 19% 0.0216 10% 0.0110 7%Maintenance 0.0187 6% 0.0100 5% 0.0100 6%Management 0.0735 25% 0.0546 25% 0.0406 25%


22KELANTAN EXPERIENCE :RBF IN JELI


23JELI WTP WITH RBF SYSTEMSEDIMENTATION TANK AERATOR PROCESS UNITFILTER TANK REFURBISH EXISTING BUILDING TREATED WATER PUMPS


24JELI WTP


Energy Efficient & Costs Savings1. Energy Costs reduced– + High Eff.Pumps & VSD2. Maintenance is minimised – Excavators, Pumps3. Filter operation is optimized – less backwash4. Very Little Sludge – no sludge management5. Optimization of WTP Whole Operation


Energy savings up to 45% with the RBF effect and VSD usage.


TURBIDITY OF RAW WATER (NTU)2010


TURBIDITY OF RAW WATER (NTU)


PRODUCTION AFTER COMPLETION OF JELI WTP WORKS


RBF – HCW PROJECTSNO. WATER TREATMENT PLANT CAPACITY(mld)COMPLETIONDATE1. Jeli-Pasir Dusun, Jeli 10 10/20102. Ayer Lanas-Gemang, Jeli 8 4/20113. Kuala Balah, Jeli 8 4/20114. Stong-Dabong, Jeli 3 7/20115. Bertam Baru, Gua Musang 4 9/20126. Peralla, Tanah Merah 2 10/20127. Pasir Tumboh, Kota Bharu 25 12/20128. Wakaf Bunut, Pasir Puteh 25 12/20129. Pintu Geng, Kota Bharu 30 2/201310. Wakaf Bharu, Tumpat 20 2/201311. Sg.Ketil, Gua Musang 20 10/201312. Kelar, Pasir Mas (2 nos.) 50 PLANNING30


KNOWLEDGE-SHARINGJPS MALAYSIA


KNOWLEDGE-SHARINGJBA PAHANG


KNOWLEDGE-SHARINGINSTITUT PENYELIDIKAN HIDRAULIK KEBANGSAAN (NAHRIM)


KNOWLEDGE-SHARINGKEMENTERIAN TENAGA,TENAGA HIJAU DAN AIR (KETTHA)


KNOWLEDGE-SHARINGKEMENTERIAN KESIHATAN MALAYSIA (KKM)


KNOWLEDGE-SHARINGLEMBAGA URUS AIR SELANGOR (LUAS) DAN JMG


KNOWLEDGE-SHARINGDATO’ TEO YEN HUA,(CEO SPAN) AND SPAN DELEGATES


KNOWLEDGE-SHARINGMinistry of Public Utility SarawakYB Datuk Sylvester Entrie Muran- Menteri Muda Kemudahan Awam Sarawak (Bekalan Air)and Sarawak Delegates


CONCLUSIONRIVERBANK FILTRATION SYSTEM (RBF) :KickOff Meeting39


1. Deferum System – using only air to oxidize Iron &Manganese and without use of chemicals.2. Ozone oxidation of iron-manganese in groundwaterin non-conventional treatment processes.3. Subterranean Iron Removal System – biochemicalreaction in aquifer to treat groundwater in primaryprocesses and without the use of chemicals.4. Organic Coagulant – use of natural herbs to producean organic coagulant for flocculation processes inconventional WTP.40

Hooray! Your file is uploaded and ready to be published.