: performance :<strong>EDP</strong> Distribuição has the concession of theNational Distribution of Electricity for Mediumand High Voltage grids and the concession of theDistribution Networks, in Low Voltage, of all themainland municipalities (278). Currently, it has224 thousand km of grid and in 2012 distributed44.7TWh of electricity to a total of 6.1 millionsupply points. In Spain, HC Energía, distributedelectricity to 5 autonomous regions, through 23 kmof grid, having distributed 9.0TWh during 2012.<strong>EDP</strong> Gás Distribuição centers its operationsin the development and exploration of the gasdistribution public grid in the northern coastregion of Portugal (29 municipalities in thedistricts of Porto, Braga and Viana do Castelo),having 4,321 km of grid and distributed in 20127.3TWh of natural gas to about 290 thousandsupply points. Naturgás Energía has 9,875km ofgrid in 9 provinces, spread across 8 autonomouscommunities where in 2012 distributed 55.8TWhto more than 1 million supply points.In 2012, the weak macroeconomic context hada negative impact in the electricity distributionactivity. Compared to 2011, <strong>EDP</strong> Distribuiçãoregistered a decrease in the level of distributedelectricity (-1.4TWh, -2.8%) along with a decreasein the number of supply points (-42 thousand),having HC Energía decreased by 0.5TWh (-5%) itselectricity distributed. However, in the gas sector,it was possible for <strong>EDP</strong> distributors to grow interms of supply points (+9 thousand in Portugaland +14 thousand in Spain), volumes sold (+3% inPortugal and +15% in Spain) and grid kilometres(+5% in Portugal and +2% in Spain)The year of 2012 was another excellent year interms of satisfying power energy demand needsin Portugal and Spain. The “Installed CapacityEquivalent Interruption Time” (ICEIT) indicatorscored the best mark ever with 58 minutes inPortugal and 28 minutes in Spain, which impliesa reduction of 17 and 11 minutes, respectivelywhen compared to 2011. In the recent years, therehas been a significant reduction of this indicatorpresenting an average of 28%/year in Portugaland 21%/year in Spain. These results follow anappropriate grid investment and maintenance,held through the implementation of projects whichaim at anticipating possible grid constraints.<strong>EDP</strong> Gás Distribuição main objective was thesaturation of the existing grid, with a particularemphasis in converting current assets to naturalgas, by building infrastructures in areas alreadysupplied with natural gas and by extending gridsto municipalities not yet supplied with natural gas.In Spain, under the expansion of Naturgas Energíadistribution grid, the company started supplyingnatural gas to the following municipalities: LaGranda-Logrezana-Tabaza, Niembro and Villallana(Asturias), Torrepacheco (Murcia), Santillana delMar and Puente Viesgo (Cantabria) and the phaseI of Masustegui-Bilbao (Basque country).Under the normal low voltage microgeneration inPortugal, 4,787 new customers were connectedwith an installed capacity of 17MW, existing at theyear-end 22,114 microgenerators connected tothe grid, with an installed capacity of 79MW. In2012 there was a significant activity of connectingmicrogenerators, with 442 new customers withan installed capacity of 21MW. Furthermore, 38new Special Regime Generators (SRG) with a64MVA capacity were connected to the grid,summing up at year-end 998 SRG with aninstalled capacity of 4,935MVA. Among the typesof customers from these new connections, windand photovoltaic technologies are predominant.In 2012, <strong>EDP</strong> Distribuição pursued the objectivewhich has been developing since 2007, ofimplementing infrastructures and changesassociated to the paradigm of the smartdistribution grids, in particular through theInovGrid project. This paradigm is based on theimplementation of a set of new technologies andadvanced models of processing information andin grid operations such as, remote management,automation, active storage and active energymanagement. These innovations will allow, onone hand, to increase the capacity to integratein the grid new ecological technologies such as,the distribution of renewable generation and theelectricity transportation and on the other hand,to provide customers conditions to increaseelectricity consumption efficiency, in particularby providing detailed and current informationabout their consumption patterns. This twofoldapproach both on clean energy integration and onan increasing consumption efficiency, positionssmart grids as an answer to the sustainabilitychallenge. The technologies and concepts ofinnovative operations that characterize the smartgrids are also a powerful tool for, increasingoperations efficiency, improving servicesprovided to customers and improving knowledgeand management of the business risks, whichare the three key objectives that outline <strong>EDP</strong>Distribuição strategy.Additional information can be found in thei&d and innovation chapter.Oliveira do Bairro Substation -Portugal<strong>EDP</strong> - <strong>Annual</strong> <strong>Report</strong> 201245
: performance :electricity AND NATURAL GAS distribution in PORTUGALINSTALLED CAPACITY EQUIVALENTINTERRUPTION TIME (MINUTES)31 36121116ELECTRICITY DISTRIBUITION Unit 2012 2011 2010 2009Energy Input in the Distribution Grid GWh 48,559 49,972 51,614 49,422For the regulated market GWh 22,818 26,978 33,484 40,452For the liberalised market GWh 25,741 22,994 18,130 8,971Distribution Losses GWh -3,904 -3,464 -3,778 -3,277Outgoing Energy from the Grid GWh 44,655 46,508 47,836 46,146Note: includes MHV consumptions2009 2010 2011 2012TIEPI75EXTRAORDINARY EVENTSOPERATIONAL EFFICIENCYELECTRICITY12.21,62013.01,67512.91,697581,7072009 2010 2011 2012SUPPLY POINTS/EMPLOYEE (#)ENERGY/EMPLOYEE (GWh)12.5Electricity Distribution in the Regulated Market GWh 19,768 24,579 30,581 37,626Very high voltage GWh 73 266 1,012 1,330High voltage GWh 192 1,008 2,095 3,723Medium voltage GWh 1,480 2,594 4,795 9,128Special low voltage GWh 985 1,615 2,498 3,163Low voltage GWh 15,610 17,551 18,653 18,740Street lighting GWh 1,428 1,544 1,528 1,542Electricity Distribution in the Liberalised Market GWh 24,888 21,930 17,255 8,520Very high voltage GWh 1,829 1,508 512 208High voltage GWh 6,296 5,455 4,387 2,089Medium voltage GWh 12,332 11,711 9,731 4,770Special low voltage GWh 2,326 1,907 1,228 413Low voltage GWh 2,105 1,349 1,398 1,040Supply Points ‘000 6,095 6,138 6,149 6,120Regulated Market ‘000 5,031 5,772 5,792 5,843Liberalised Market ‘000 1,064 366 357 277ICEIT minutes 58 75 152 152Employees # 3,571 3,617 3,670 3,778Grid structure indicatorsExtension km 223,734 222,627 220,318 218,226Overhead lines km 174,293 173,469 172,181 170,931Underground lines km 49,442 49,158 48,138 47,295Substations # 414 411 404 399Transformation stations # 65,151 64,458 63,223 62,036Efficiency indicatorsSupply Points/Employee # 1,707 1,697 1,675 1,620Energy/Employee GWh 12.5 12.9 13.0 12.2DISTRIBUTED GASAND SUPPLY POINTS2216.12456.82712907.1 7.32009 2010 2011 2012Gas Distribution Unit 2012 2011 2010 2009Gas Distribution in the Regulated Market GWh 1,362 1,467 3,071 3,877Medium and High Pressure GWh 357 146 1,305 1,687Low Pressure GWh 1,004 1,321 1,766 2,190Gas Distribution in the Liberalised Market GWh 5,961 5,671 3,772 2,255Medium and High Pressure GWh 5,929 5,066 2,705 1,850Low Pressure GWh 32 605 1,067 405Supply Points # 289,657 270,866 245,347 221,388Regulated Market # 253,892 270,054 244,727 221,277Liberalised Market # 35,765 812 620 111Grid Distribution Extension km 4,321 4,125 3,827 3,508DISTRIBUTED GAS (TWh)SUPPLY POINTS (THOUSANDS)GAS DISTRIBUTION GRID (km)3,5083,8274,1254,3212009 2010 2011 201246A World Full Of Energy
- Page 1: Impresso em papel elaborado com cel
- Page 6 and 7: : edp :index6 edp6 message to share
- Page 8 and 9: : edp :EDP - Annual Report 20127
- Page 10 and 11: Portugalrenewablesgás7,194 Employe
- Page 12 and 13: : edp :1.1.3. CORPORATEBODIESboard
- Page 14 and 15: : edp :1.1.5. principles ofsustaina
- Page 16 and 17: : edp :BRAzILEDP Brasil distinguish
- Page 18 and 19: : edp :1.3.2. Operating HighlightsU
- Page 20: : edp :1.3.5. ENVIRONMENT INDICATOR
- Page 24 and 25: : edp :strategicframeworkxxxxxxxxxx
- Page 26 and 27: : strategic framework :Reconversion
- Page 28 and 29: : strategic framework :EVOLUTION OF
- Page 30 and 31: : strategic framework :million at D
- Page 32 and 33: : strategic framework :Since 2005,
- Page 34: : strategic framework :EDP - Annual
- Page 38 and 39: : a edp :performance38 business40 I
- Page 40 and 41: : performance :EDP - Annual Report
- Page 42 and 43: : performance :By the end of the ye
- Page 44 and 45: : performance :electricity generati
- Page 48 and 49: : performance :electricity AND GAS
- Page 50 and 51: : performance :Despite the increase
- Page 52 and 53: : performance :electricity supply i
- Page 54 and 55: : performance :In 2012, EDPR increa
- Page 56 and 57: : performance :3.1.3. EDP BRAsILEDP
- Page 58 and 59: : performance :EDP brasilGENERATION
- Page 60 and 61: : performance :Distribution of comp
- Page 62 and 63: : performance :testing the adherenc
- Page 64 and 65: : performance :3.4.1. managementsys
- Page 66 and 67: : performance :In Brazil, EDP has n
- Page 68 and 69: : performance :that 117 m 3 of oil
- Page 70 and 71: : performance :EDP has undertaken t
- Page 72 and 73: : performance :encourages professio
- Page 74 and 75: : performance :The set of indicator
- Page 76 and 77: : performance :Voice of the custome
- Page 78 and 79: : performance :(ACAPO), are also av
- Page 80 and 81: : performance :3.7. suppliersThe pe
- Page 82 and 83: : performance :Transparency; Leader
- Page 84 and 85: : performance :The following table
- Page 86: : performance :between the local au
- Page 90 and 91: : a edp :Corporate governance89 sta
- Page 92 and 93: : corporate governance :STATEMENT O
- Page 94 and 95: : corporate governance :STATEMENT O
- Page 96 and 97:
: corporate governance :I. GENERALM
- Page 98 and 99:
: corporate governance :In all othe
- Page 100 and 101:
: corporate governance :II.1.1. Cor
- Page 102 and 103:
: corporate governance :The company
- Page 104 and 105:
: corporate governance :Strategy Co
- Page 106 and 107:
: corporate governance :Companies C
- Page 108 and 109:
: corporate governance :From 22 Feb
- Page 110 and 111:
: corporate governance :The Institu
- Page 112 and 113:
: corporate governance :Careers, Mo
- Page 114 and 115:
: corporate governance :Commercial
- Page 116 and 117:
: corporate governance :Corporate S
- Page 118 and 119:
: corporate governance :new matters
- Page 120 and 121:
: corporate governance :with the Eu
- Page 122 and 123:
: corporate governance :unavailabil
- Page 124 and 125:
: corporate governance :in share ca
- Page 126 and 127:
: corporate governance :II.19. Posi
- Page 128 and 129:
: corporate governance :II.26. Rule
- Page 130 and 131:
: corporate governance :II.28. Posi
- Page 132 and 133:
: corporate governance :Executive B
- Page 134 and 135:
: corporate governance :EDP has no
- Page 136 and 137:
: corporate governance :CHAPTER III
- Page 138 and 139:
: corporate governance :III.3. Hold
- Page 140 and 141:
: corporate governance :Share price
- Page 142 and 143:
: corporate governance :Capital Mar
- Page 144 and 145:
: corporate governance :III.13. Int
- Page 146 and 147:
: corporate governance :In 2012, th
- Page 151 and 152:
EDP Renováveis opensfirst wind far
- Page 153 and 154:
: financial report :5.1. edp group
- Page 155 and 156:
: financial report :these impacts,
- Page 157 and 158:
: financial report :local currency,
- Page 159 and 160:
: financial report :amount of EUR 1
- Page 161 and 162:
: financial report :EDP - Energias
- Page 163 and 164:
: financial report :EDP - Energias
- Page 165 and 166:
: financial report :EDP - Energias
- Page 167 and 168:
: financial report :EDP - Energias
- Page 169 and 170:
: financial report :EDP - Energias
- Page 171 and 172:
12.pdf 1 02/04/13 14:50notes to the
- Page 173 and 174:
notes to the consolidated EDP and -
- Page 175 and 176:
notes to the consolidated EDP and -
- Page 177 and 178:
notes to the consolidated and compa
- Page 179 and 180:
notes to the consolidated EDP and -
- Page 181 and 182:
notes to the consolidated EDP and -
- Page 183 and 184:
notes to the consolidated EDP and -
- Page 185 and 186:
notes to the consolidated EDP and -
- Page 187 and 188:
notes to the consolidated EDP and -
- Page 189 and 190:
notes to the consolidated EDP and -
- Page 191 and 192:
notes to the consolidated EDP and -
- Page 193 and 194:
notes to the consolidated EDP - and
- Page 195 and 196:
notes to the consolidated EDP and -
- Page 197 and 198:
notes to the consolidated EDP - and
- Page 199 and 200:
notes to the consolidated EDP - and
- Page 201 and 202:
notes to the consolidated EDP - and
- Page 203 and 204:
notes to the consolidated EDP and -
- Page 205 and 206:
notes to the consolidated EDP - and
- Page 207 and 208:
notes to the consolidated EDP - and
- Page 209 and 210:
notes to the consolidated and compa
- Page 211 and 212:
notes to the consolidated EDP - and
- Page 213 and 214:
notes to the consolidated EDP - and
- Page 215 and 216:
notes to the consolidated EDP - and
- Page 217 and 218:
notes to the consolidated EDP - and
- Page 219 and 220:
notes to the consolidated EDP and -
- Page 221 and 222:
notes to the consolidated EDP and -
- Page 223 and 224:
notes to the consolidated EDP - and
- Page 225 and 226:
notes to the consolidated EDP - and
- Page 227 and 228:
notes to the consolidated EDP - and
- Page 229 and 230:
notes to the consolidated EDP - and
- Page 231 and 232:
notes to the consolidated EDP and -
- Page 233 and 234:
notes to the consolidated EDP - and
- Page 235 and 236:
notes to the consolidated EDP and -
- Page 237 and 238:
notes to the consolidated EDP - and
- Page 239 and 240:
notes to the consolidated EDP - and
- Page 241 and 242:
notes to the consolidated EDP - and
- Page 243 and 244:
notes to the consolidated EDP - and
- Page 245 and 246:
EDP - Energias de Portugal, S.A.Not
- Page 247 and 248:
notes to the consolidated EDP - and
- Page 249 and 250:
notes to the consolidated EDP and -
- Page 251 and 252:
notes to the consolidatedEDPand- En
- Page 253 and 254:
notes to the consolidated EDP - and
- Page 255 and 256:
notes to the consolidated EDP and -
- Page 257 and 258:
notes to the consolidated and compa
- Page 259 and 260:
notes to the consolidated and compa
- Page 261 and 262:
notes to the consolidated and compa
- Page 263 and 264:
notes to the consolidated and compa
- Page 265 and 266:
notes to the consolidated and compa
- Page 269 and 270:
Hydroelectric powerplant of Bempost
- Page 271 and 272:
: annexes :annexesannex Ifinal refe
- Page 273 and 274:
: annexes :by Instituto Superior de
- Page 275 and 276:
: annexes :Chairman of Euronext Lis
- Page 277 and 278:
: annexes :basis. He was designated
- Page 279 and 280:
: annexes :annex IIItransactions pe
- Page 281 and 282:
: annexes :EDP’s material issues
- Page 283 and 284:
: annexes :Simultaneously, the foll
- Page 285 and 286:
: annexes :GRI complianceThis repor
- Page 287 and 288:
: annexes :286A World Full Of Energ
- Page 289 and 290:
: annexes :288A World Full Of Energ
- Page 291 and 292:
: annexes :290A World Full Of Energ
- Page 293 and 294:
: annexes :292A World Full Of Energ
- Page 295 and 296:
: annexes :294A World Full Of Energ
- Page 297 and 298:
: annexes :296A World Full Of Energ
- Page 299 and 300:
: annexes :298A World Full Of Energ
- Page 301 and 302:
: annexes :300A World Full Of Energ
- Page 303 and 304:
: annexes :302A World Full Of Energ
- Page 305 and 306:
: annexes :304A World Full Of Energ