: performance :By the end of the year, the total installed capacityin Iberia (excluding wind) was 13,808.6MW, outof which 5,699MW were from hydroelectric plantsand 7.643MW from thermoelectric plants.In Portugal, hydroelectric plants represent 53%of <strong>EDP</strong> Produção installed capacity.2012 was characterized by below average inflowsto the system, resulting in an hydrological indexat the end of the year of 0.48 in Portugal andof 0.46 in Spain, quite below the 0.92 and 0.81respectively registered in 2011.In this context, the Hydroelectric Ordinary regimegeneration of <strong>EDP</strong> Produção was 5,432GWhwhich is quite lower than the generation figuresrecorded in 2011 (10,485GWh). At the end of theyear, the storage reservoirs level representedabout 57% of its maximum capacity (49% in2011). Moreover, the Thermoelectric ordinaryregime generation of <strong>EDP</strong> Produção was stronglyconstrained by the high levels of imports andby the low usage of CCGT plants (1,507GWh in2012 vs 4,072GWh in 2011), having decreased by7.2% in the year to 10,155GWh, representing thesecond lowest value in 20 years. Sines plant, onthe other hand, in a context marked by low coaland CO 2prices, increased it operations regime,raising generation to 8.6GWh, which representsan increase of 26% compared to 2011.In Spain, due to a more competitive coal price (vs.that of CCGT), coal generation increased by 25%(6,714GWh in 2012 vs. 5,354GWh in 2011), whileCCGT generation decreased by 42% (1,598GWhvs. 2,754GWh). The availability of coal plants was91.9%, which confirms the proper functioning ofits operations, particularly taking into accountits flexible operations, given its complementarycharacter between coal and gas. The availabilityof CCGT plants was 94.4%, with frequentinterruptions due to market requisitions.In terms of existing power plants, the activityof the Carregado thermoelectric plant ceasedoperations on the 1st of April (710MW), havingstarted at the end of the year the first phase ofits decommissioning process. It is noteworthythe completion, during the month of March,the decommissioning works and environmentrestoration of the Barreiro thermoelectric plantalong with the corresponding signature of itsprovisional acceptance certificate.Regarding <strong>EDP</strong> Produção hydroelectricgeneration portfolio capacity, it is worthmentioning the conclusion of construction andassembly works of Alqueva repowering, havingthe two new generator groups (256MW) initiatedits trial period on November 26 and entered intooperation on December 2012.The construction works of the hydroelectricplants of Baixo Sabor (172MW) and Ribeiradio/Ermida (81MW) with conclusion scheduledfor 2014, along with the repowering of VendaNova III (756MW) and Salamonde II (207MW),with conclusion scheduled for 2015, and theconstruction of Foz-Tua (252MW), which will beextended until 2016, proceeded as planned.Baixo Sabor Hydroelectric Power Plant<strong>EDP</strong> - <strong>Annual</strong> <strong>Report</strong> 201241
: performance :electricity generation in PORTUGALGENERATION PORTFOLIO (MW)9,974 9,94310,3809,9262,0201,9891,9891,2782,0392,0392,039 2,0391,1801,1801,1801,1804,7354,7355,1725,4292009 2010 2011 2012HYDRO COAL CCGT OTHERSAVAILABILITY (%)96.696.995.7 96.595.5 96.494.994.192.893.5Unit 2012 2011 2010 2009Installed Capacity in Portugal* MW 14,352 14,814 14,198 13,304<strong>EDP</strong> Installed Capacity* MW 9,926 10,380 9,943 9,974<strong>EDP</strong> market share* % 69 70 70 75Source: REN Technical dataNumber of Generator Groups* # 188 192 190 190Ordinary Regime Generation # 112 116 114 116Hydroelectric power plants # 97 95 93 93Thermoelectric power plants # 15 21 21 23Special Regime Generation # 76 76 76 74Installed Capacity at December 31* MW 9,926 10,380 9,943 9,974Ordinary Regime Installed Capacity MW 9,603 10,056 9,619 9,675Hydroelectric power plants MW 5,273 5,015 4,578 4,578Thermoelectric power plants MW 4,330 5,040 5,040 5,096Coal MW 1,180 1,180 1,180 1,180CCGT MW 2,039 2,039 2,039 2,039Fuel oil MW 946 1,657 1,657 1,713Gasoil MW 165 165 165 165Special Regime Installed Capacity MW 324 324 324 299Hydroelectric power plants MW 157 157 157 157Biomass MW 32 32 32 32Cogeneration MW 135 136 136 1112009 2010 2011HYDROELECTRIC THERMOELECTRICBIOMASS COGENERATIONNET GENERATION (GWh)26,09324,73622,97411,09516,72612,05014,99810,9248,0102012MINI-HYDRO17,01611,3325,684Net Generation* GWh 17,016 22,974 26,093 24,736Ordinary Regime Generation GWh 15,587 21,429 24,468 23,514Hydroelectric power plants GWh 5,432 10,485 14,376 7,642Thermoelectric power plants GWh 10,155 10,944 10,092 15,872Coal GWh 8,647 6,879 4,889 8,869CCGT GWh 1,507 4,072 5,156 6,696Fuel oil GWh 1 -6 46 307Gasoil GWh 0 0 1 0Special Regime Generation GWh 1,429 1,545 1,625 1,222Mini-Hydroelectric power plants GWh 253 439 622 368Biomass GWh 207 198 203 129Cogeneration GWh 970 907 800 725* Excludes wind2009201020112012HYDROELECTRICGENERATIONTHERMOELECTRICGENERATIONEnergy Balance Unit 2012 2011 2010 2009ENERGY DELIVEREDTO DISTRIBUTION (TWh)49.94.819.152.2 50.5 49.12.622.02.823.37.922.7Hydrological index # 0.48 0.92 1.31 0.77<strong>EDP</strong> Group power plantsHydroelectric output GWh 5,432 10,485 14,376 7,642Thermoelectric output GWh 10,155 10,944 10,092 15,872Mini-hydroelectric output GWh 253 439 622 368Wind power output (ENERNOVA) GWh 1,444 1,391 1,472 1,273Biomass output GWh 207 198 203 129Cogeneration output GWh 970 907 800 725Output to grid (<strong>EDP</strong> Group) GWh 18,460 24,364 27,565 26,00926.0200927.6201024.4201118.52012Other generators with PPA GWh 8,012 8,814 7,701 8,088Other generators SRG GWh 16,079 15,246 14,821 11,927Importer/(Exporter) balance GWh 7,895 2,813 2,623 4,777Pumped hydroelectric storage GWh -1,388 -737 -512 -929Consumption related to output GWh 49,058 50,499 52,198 49,872<strong>EDP</strong> GROUP OUTPUTIMPORTSOTHER GENERATORSSynchronous compensation GWh 1 -1 0 -1Own consumption in generation GWh -5 -6 -5 -5Energy Delivered to Distribution GWh 49,054 50,492 52,193 49,86642A World Full Of Energy
- Page 1: Impresso em papel elaborado com cel
- Page 6 and 7: : edp :index6 edp6 message to share
- Page 8 and 9: : edp :EDP - Annual Report 20127
- Page 10 and 11: Portugalrenewablesgás7,194 Employe
- Page 12 and 13: : edp :1.1.3. CORPORATEBODIESboard
- Page 14 and 15: : edp :1.1.5. principles ofsustaina
- Page 16 and 17: : edp :BRAzILEDP Brasil distinguish
- Page 18 and 19: : edp :1.3.2. Operating HighlightsU
- Page 20: : edp :1.3.5. ENVIRONMENT INDICATOR
- Page 24 and 25: : edp :strategicframeworkxxxxxxxxxx
- Page 26 and 27: : strategic framework :Reconversion
- Page 28 and 29: : strategic framework :EVOLUTION OF
- Page 30 and 31: : strategic framework :million at D
- Page 32 and 33: : strategic framework :Since 2005,
- Page 34: : strategic framework :EDP - Annual
- Page 38 and 39: : a edp :performance38 business40 I
- Page 40 and 41: : performance :EDP - Annual Report
- Page 44 and 45: : performance :electricity generati
- Page 46 and 47: : performance :EDP Distribuição h
- Page 48 and 49: : performance :electricity AND GAS
- Page 50 and 51: : performance :Despite the increase
- Page 52 and 53: : performance :electricity supply i
- Page 54 and 55: : performance :In 2012, EDPR increa
- Page 56 and 57: : performance :3.1.3. EDP BRAsILEDP
- Page 58 and 59: : performance :EDP brasilGENERATION
- Page 60 and 61: : performance :Distribution of comp
- Page 62 and 63: : performance :testing the adherenc
- Page 64 and 65: : performance :3.4.1. managementsys
- Page 66 and 67: : performance :In Brazil, EDP has n
- Page 68 and 69: : performance :that 117 m 3 of oil
- Page 70 and 71: : performance :EDP has undertaken t
- Page 72 and 73: : performance :encourages professio
- Page 74 and 75: : performance :The set of indicator
- Page 76 and 77: : performance :Voice of the custome
- Page 78 and 79: : performance :(ACAPO), are also av
- Page 80 and 81: : performance :3.7. suppliersThe pe
- Page 82 and 83: : performance :Transparency; Leader
- Page 84 and 85: : performance :The following table
- Page 86: : performance :between the local au
- Page 90 and 91: : a edp :Corporate governance89 sta
- Page 92 and 93:
: corporate governance :STATEMENT O
- Page 94 and 95:
: corporate governance :STATEMENT O
- Page 96 and 97:
: corporate governance :I. GENERALM
- Page 98 and 99:
: corporate governance :In all othe
- Page 100 and 101:
: corporate governance :II.1.1. Cor
- Page 102 and 103:
: corporate governance :The company
- Page 104 and 105:
: corporate governance :Strategy Co
- Page 106 and 107:
: corporate governance :Companies C
- Page 108 and 109:
: corporate governance :From 22 Feb
- Page 110 and 111:
: corporate governance :The Institu
- Page 112 and 113:
: corporate governance :Careers, Mo
- Page 114 and 115:
: corporate governance :Commercial
- Page 116 and 117:
: corporate governance :Corporate S
- Page 118 and 119:
: corporate governance :new matters
- Page 120 and 121:
: corporate governance :with the Eu
- Page 122 and 123:
: corporate governance :unavailabil
- Page 124 and 125:
: corporate governance :in share ca
- Page 126 and 127:
: corporate governance :II.19. Posi
- Page 128 and 129:
: corporate governance :II.26. Rule
- Page 130 and 131:
: corporate governance :II.28. Posi
- Page 132 and 133:
: corporate governance :Executive B
- Page 134 and 135:
: corporate governance :EDP has no
- Page 136 and 137:
: corporate governance :CHAPTER III
- Page 138 and 139:
: corporate governance :III.3. Hold
- Page 140 and 141:
: corporate governance :Share price
- Page 142 and 143:
: corporate governance :Capital Mar
- Page 144 and 145:
: corporate governance :III.13. Int
- Page 146 and 147:
: corporate governance :In 2012, th
- Page 151 and 152:
EDP Renováveis opensfirst wind far
- Page 153 and 154:
: financial report :5.1. edp group
- Page 155 and 156:
: financial report :these impacts,
- Page 157 and 158:
: financial report :local currency,
- Page 159 and 160:
: financial report :amount of EUR 1
- Page 161 and 162:
: financial report :EDP - Energias
- Page 163 and 164:
: financial report :EDP - Energias
- Page 165 and 166:
: financial report :EDP - Energias
- Page 167 and 168:
: financial report :EDP - Energias
- Page 169 and 170:
: financial report :EDP - Energias
- Page 171 and 172:
12.pdf 1 02/04/13 14:50notes to the
- Page 173 and 174:
notes to the consolidated EDP and -
- Page 175 and 176:
notes to the consolidated EDP and -
- Page 177 and 178:
notes to the consolidated and compa
- Page 179 and 180:
notes to the consolidated EDP and -
- Page 181 and 182:
notes to the consolidated EDP and -
- Page 183 and 184:
notes to the consolidated EDP and -
- Page 185 and 186:
notes to the consolidated EDP and -
- Page 187 and 188:
notes to the consolidated EDP and -
- Page 189 and 190:
notes to the consolidated EDP and -
- Page 191 and 192:
notes to the consolidated EDP and -
- Page 193 and 194:
notes to the consolidated EDP - and
- Page 195 and 196:
notes to the consolidated EDP and -
- Page 197 and 198:
notes to the consolidated EDP - and
- Page 199 and 200:
notes to the consolidated EDP - and
- Page 201 and 202:
notes to the consolidated EDP - and
- Page 203 and 204:
notes to the consolidated EDP and -
- Page 205 and 206:
notes to the consolidated EDP - and
- Page 207 and 208:
notes to the consolidated EDP - and
- Page 209 and 210:
notes to the consolidated and compa
- Page 211 and 212:
notes to the consolidated EDP - and
- Page 213 and 214:
notes to the consolidated EDP - and
- Page 215 and 216:
notes to the consolidated EDP - and
- Page 217 and 218:
notes to the consolidated EDP - and
- Page 219 and 220:
notes to the consolidated EDP and -
- Page 221 and 222:
notes to the consolidated EDP and -
- Page 223 and 224:
notes to the consolidated EDP - and
- Page 225 and 226:
notes to the consolidated EDP - and
- Page 227 and 228:
notes to the consolidated EDP - and
- Page 229 and 230:
notes to the consolidated EDP - and
- Page 231 and 232:
notes to the consolidated EDP and -
- Page 233 and 234:
notes to the consolidated EDP - and
- Page 235 and 236:
notes to the consolidated EDP and -
- Page 237 and 238:
notes to the consolidated EDP - and
- Page 239 and 240:
notes to the consolidated EDP - and
- Page 241 and 242:
notes to the consolidated EDP - and
- Page 243 and 244:
notes to the consolidated EDP - and
- Page 245 and 246:
EDP - Energias de Portugal, S.A.Not
- Page 247 and 248:
notes to the consolidated EDP - and
- Page 249 and 250:
notes to the consolidated EDP and -
- Page 251 and 252:
notes to the consolidatedEDPand- En
- Page 253 and 254:
notes to the consolidated EDP - and
- Page 255 and 256:
notes to the consolidated EDP and -
- Page 257 and 258:
notes to the consolidated and compa
- Page 259 and 260:
notes to the consolidated and compa
- Page 261 and 262:
notes to the consolidated and compa
- Page 263 and 264:
notes to the consolidated and compa
- Page 265 and 266:
notes to the consolidated and compa
- Page 269 and 270:
Hydroelectric powerplant of Bempost
- Page 271 and 272:
: annexes :annexesannex Ifinal refe
- Page 273 and 274:
: annexes :by Instituto Superior de
- Page 275 and 276:
: annexes :Chairman of Euronext Lis
- Page 277 and 278:
: annexes :basis. He was designated
- Page 279 and 280:
: annexes :annex IIItransactions pe
- Page 281 and 282:
: annexes :EDP’s material issues
- Page 283 and 284:
: annexes :Simultaneously, the foll
- Page 285 and 286:
: annexes :GRI complianceThis repor
- Page 287 and 288:
: annexes :286A World Full Of Energ
- Page 289 and 290:
: annexes :288A World Full Of Energ
- Page 291 and 292:
: annexes :290A World Full Of Energ
- Page 293 and 294:
: annexes :292A World Full Of Energ
- Page 295 and 296:
: annexes :294A World Full Of Energ
- Page 297 and 298:
: annexes :296A World Full Of Energ
- Page 299 and 300:
: annexes :298A World Full Of Energ
- Page 301 and 302:
: annexes :300A World Full Of Energ
- Page 303 and 304:
: annexes :302A World Full Of Energ
- Page 305 and 306:
: annexes :304A World Full Of Energ