application for mining approval would need to be developed by Xstrata, andconsidered by the approval body, having regard to all information available atthat time, including this SMP if approved.Glendell has accepted liability for subsidence damage which might be causedto its overburden dump by reason of GCCM's undermining. Specifically, inthe MPLA Agreement, Glendell agreed to:indemnify MMC against all claims costs demands losses or expenses suffered byGlendell for which MMC would otherwise be liable in connection with damage tothe emplacement due to subsidence arising out of or in connection with MMC'sunderground mining activities carried out under CL 382 on the Land providedthat the mining is carried out my MMC in accordance with approvals from theDepartment of Mineral Resources.Managing and repairing any subsidence damage to the overburden dump istherefore the responsibility of Glendell and no specific management strategieshave been recommended.Mt Owen West DumpThe Mt Owen Complex Mining Operations <strong>Plan</strong> (MOP) dated January 2006indicates that the area of the West Dump overlying the SMP Application Areawill be rehabilitated in 2009/2010. In this instance, the West Dump would notbe impacted by subsidence and no specific management strategies have beenrecommended.Mt Owen Eastern Rail PitIn the event that the Eastern Rail Pit is backfilled and rehabilitated prior toundermining as indicated within the Mt Owen EIS (Umwelt, 2003), theproposed longwall mining will not create a risk for either GCCM or XMOoperations (Umwelt, 2004d).In the event that the pit is used for a tailings dam, the proposed changes willneed to be the subject of further approval and such changes would need to beassessed by XMO/Xstrata, and considered by the approval body, havingregard to all information available at that time, including this SMP ifapproved. In this instance there would be expected to be some potential forinstability of the rock slopes due to subsidence.GCCM has prepared a subsidence management plan for the Eastern Rail Pit,on the basis of consultation with Xstrata (Annex K). Under the terms of theDeed, XMO is not permitted to object to DPI or any other person about thisSMP which will include the management plan for the Eastern Rail Pit. GCCMwill cooperate with XMO to accommodate any reasonable changes arisingfrom their operational requirements up to the point that such changes do notENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0038321/FINAL/3 JANUARY 200723

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!