13.07.2015 Views

Smoke ventilation according to EN 12101-2 - D+H Mechatronic

Smoke ventilation according to EN 12101-2 - D+H Mechatronic

Smoke ventilation according to EN 12101-2 - D+H Mechatronic

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2. Initial inspection of fac<strong>to</strong>ry production control and the quality planThe NSHEV manufacturer must establish fac<strong>to</strong>ry production control <strong>to</strong> ensure that the NSHEV brought in<strong>to</strong> circulationexhibits the specified performance classes. This is tested by the notified test centre.The fac<strong>to</strong>ry production control must include processes and procedures <strong>to</strong> verify the manufacture of the NSHEV insuitable production steps. The production machines and the measuring and testing equipment are also examined.The manufacturer must also create a product-specific quality plan that defines the frequency with which tests areperformed on the NSHEV components or on the finished NSHEV.2.3. The EC certificate of conformityAfter all tests have been completed, the NSHEV distribu<strong>to</strong>r receives the EC certificate of conformity and is therebyauthorised <strong>to</strong> mark the NSHEVs <strong>according</strong>ly. The second and third pages of the certificate contain the productand classification characteristics.Section A25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!