Exhibit P-5 Cost AnalysisWeapon SystemAIS hardware, software, and upgradesAppropriation (Treasury) Code/CC/<strong>BA</strong>/BSA/Item Control NumberID Code<strong>Other</strong> <strong>Procurement</strong>, <strong>Navy</strong>/<strong>BA</strong>-6/706900WBS COST ELEMENTS PYs Total FY03 FY03 FY04 FY04 TotalCost Unit Cost Total Cost Unit cost CostFY05Unit CostDate:February 2005P-1 Line Item NomenclatureJWAC SupportFY05Total CostFY06Unit CostFY06Total CostFY07Unit CostFY07Total CostAIS Cost Elements:NT & Unix workstations, servers,and software10.5 Various 3.8 Various 3.3 Various 2.7 Various 3.9 Various 3.4Mass storage system 4.4 Various 1.5 Various 2.0 Various 1.9 Various 2.3 Various 2.2Network Infrastructure 2.2 Various 1.0 Various 0.8 Various 0.8 Various 1.0 Various 1.0Miscellaneous hardware, software, 9.9 Various 3.3 Various 2.7 Various 2.2 Various 1.6 Various 1.7and upgradesTotal 27.0 9.6 8.8 7.6 8.8 8.3In order to provide the complex computing environment necessary to meet the Joint Warfare Analysis Centers (JWAC) mission, contracts have been established that allow for Indefinite Deliveriesand Indefinite Quantities (IDIQ), multiple options, and multiple delivery dates.NT & Unix workstations, servers, and software -The $1.2M increase for FY05-06 is to support replacements of desktop workstations, servers and software necessary to maintain JWAC’s computingenvironment.Mass storage – The $400K increase from FY05-06 is to procure an alternate capability to allow continuity of business operations. Replacement of mass storage components occurs at variousintervals (multiple optical disk robots, servers, tape drives, and towers).Network Infrastructure items –Upgrades and life-cycle replacements of different network components occur in each fiscal year at planned intervals.Miscellaneous items – Upgrades audiovisual equipment, paging and sound system, UPS and associated AIS equipment to support and maintain the changing AIS needs for the JWAC.Exhibit P-5 Cost AnalysisP-1 Shopping List – Item No. 133Page 3 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!