13.07.2015 Views

Other Procurement, BA 4 - U.S. Navy

Other Procurement, BA 4 - U.S. Navy

Other Procurement, BA 4 - U.S. Navy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED FEBRUARY 2005P3A (Continued)INDIVIDUAL MODIFICATION (Continued)MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: Surface ASW Support Equipment (Fire Control/SVTT)Installation funds of all Fire Control/SVTT ORDALTs on CG's, DDG's and FFG's. AINSTALLATION INFORMATION:METHOD OF IMPLEMENTATION: Shipyards & AITsvariable number of these installs each year will be done at shoresites or in labs and willnot require install funds.ADMINISTRATIVE LEADTIME: 3 MonthsPRODUCTION LEADTIME:CONTRACT DATES: FY 2004: FY 2005: FY 2006: FY 2007:DELIVERY DATE: FY 2004: FY 2005: FY 2006: FY 2007:($ in Millions)Cost: FY 2003 & Prior FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete TotalQty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $FY 2003 and PRIOR YEARS 0 0.0FY 2004 EQUIPMENT 478 0.3 478 0.3FY 2005 EQUIPMENT 115 0.2 115 0.2FY 2006 EQUIPMENT 120 0.2 120 0.2FY 2007 EQUIPMENTFY 2008 EQUIPMENTVar 120 0.2 120 0.2Var 109 0.2 109 0.2FY 2009 EQUIPMENT 112 0.2 112 0.2FY 2010 EQUIPMENTVar 294 0.2 294 0.2FY 2011 EQUIPMENT 462 0.2 462 0.2TO COMPLETE TBD TBD TBD TBDINSTALLATION SCHEDULE:FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTALIn 0 478 0 0 0 115 0 0 0 120 0 0 0 ## 0 0 0 109 0 0 0 112 0 0 0 294 0 0 0 462 0 0 0 TBD TBDOut 0 0 170 170 138 0 40 40 35 0 40 40 40 0 40 40 40 0 37 36 36 0 38 37 37 0 100 100 94 0 170 170 122 TBD TBDP-3AITEM NO. 114 Page 6CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!