13.07.2015 Views

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

undervoltage setting:setting range setting step accuracyactivation 100 à 690 V 5 V 0 % to 5 %thresholdactivation 0.2 to 5 s 0.1 s 0 % to 20 %time delayde-activation 690 V of activation 5 V 0 % to 5 %thresholdthresholdde-activation 0.2 to 36 s 0.1 s 0 % to 20 %time delayb overvoltage setting:setting range setting step accuracyactivation 100 à 1200 V 5 V -5 % to 0 %thresholdactivation 0.2 to 5 s 0.1 s 0 % to 20 %time delayde-activation 100 V of activation 5 V -5 % to 0 %thresholdthresholdde-activation 0.2 to 36 s 0.1 s 0 % to 20 %time delay4.2.2.5 Reverse active powerb applicationreverse power <strong>protection</strong> is used to protect <strong>generator</strong>s connected with the mains(as an auxiliary or standby source) and <strong>generator</strong>s operating in parallelautonomously (e.g. marine).NoteFor <strong>protection</strong> of <strong>generator</strong>s driven by diesel sets, the threshold must be setbetween 5 and 20 % of <strong>generator</strong> active power for a period of 2 seconds.For <strong>protection</strong> of <strong>generator</strong>s driven by steam turbines, the threshold must be setbetween 1 and 5 % of active power for a period of 2 secondsb principle:the function is activated when the active power flowing in the oppo<strong>site</strong> flowdirection to the energy defined by the user, is greater than the activationthreshold for a time longer than the time delay.E88012EActivation zoneDe-activationzoneDe-activation time delayActivation time delayActivationthresholdDe-activationthresholdReverse powerFigure 29.35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!