13.07.2015 Views

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Protection and Monitoringof a <strong>LV</strong> Generator SetE89635E79360E<strong>Electric</strong>al utilityHV incomerNCMains 1feederMains 2feederNon-sensitiveloadUninterruptiblepower supplySensitive feedersFigure 17: GS-UPS combination for Quality Energy.UPS powerUPS inrush power must allow for:b nominal power of the downstream loads. This is the sum of the apparentpowers Pa absorbed by each application. Furthermore, so as not to oversize theinstallation, the overload capacities at UPS level must be considered (forexample: 1.5 ln for 1 minute and 1.25 ln for 10 minutes).b the power required to recharge the battery: this current is proportional to theautonomy required for a given power. The sizing Sr of a UPS is given by:Sr = 1.17 x Pn.The table below defines the pick-up currents and <strong>protection</strong> devices for supplyingthe rectifier (Mains 1) and the standby mains (Mains 2).Table: pick-up currents and <strong>protection</strong> devicesnominal power current value (A)Pn mains 1 with 3Ph battery mains 2 or 3Ph application400 V - l1 400 V lu40 kVA 86 60.560 kVA 123 9180 kVA 158 121100 kVA 198 151120 kVA 240 182160 kVA 317 243200 kVA 395 304250 kVA 493 360300 kVA 590 456400 kVA 793 608500 kVA 990 760600 kVA 1180 912800 kVA 1648 121522

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!