13.07.2015 Views

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

LV generator protection - engineering site - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E79475EGSRemote control 2Remote control 1PrioritymotorsPriorityresistive loadsFigure 16: Restarting of priority motors (Σ P > 1/3 Pn).Restarting tips:b if the Pmax of the largest motor > 1/3 Pn, a progressive starter must beinstalled on this motorb if Σ Pmotors > 1/3 Pn, motor cascade restarting must be managed by a PLCb if Σ Pmotors < 1/3 Pn, there are no restarting problems.3.3.3. Non-linear loads - Example of a UPSNon-linear loadsThese are mainly:b saturated magnetic circuitsb discharge lamps, fluorescent lightsb electronic converters:v computer processing systems: PC, computers, etc.v etc.These loads generate harmonic currents: supplied by a Generator Set, this cancreate high voltage distortion due to the low short-circuit power of the <strong>generator</strong>.Uninterruptible Power Supply (UPS)The combination of a UPS and <strong>generator</strong> set is the best solution for ensuringquality power supply with long autonomy for the supply of sensitive loads.It is also a non-linear load due to the input rectifier. On source switching, theautonomy of the UPS on battery must allow starting and connection of theGenerator Set.21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!