13.07.2015 Views

FD01-24 - QinetiQ North America

FD01-24 - QinetiQ North America

FD01-24 - QinetiQ North America

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTRACT NO.N00178-04-D-4096DELIVERY ORDER NO.<strong>FD01</strong>AMENDMENT/MODIFICATION NO.<strong>24</strong>PAGE23 of 55FINALdisplays/graphical interface units.TASK AREA 9 Program Management SupportThe contractor shall perform scientific and engineering analyses for long term Navy developmentprograms. The analyses will involve combining the disciplines of underwater acoustics, underseawarfare, acoustic propagation, signature data collection, submarine quieting, RCS measurement &reduction, and Navy acoustic system development to support NSWCCD participation in currentand future signature measurement programs. Analyze and review program areas includingplanning for advanced transient experimentation, developing POA&M and ILS planning,configuration management planning, documentation, and support for SASMP, SSGN, SSN23,NAVAIR, SPAWARS, ONI, ONR, Virginia Class Programs, and ACINT Programs. Results shallbe incorporated into both planning and analysis functions for NSWCCD in each long termproject area. The contractor shall provide liaison and progress monitoring of NSWCCD programsthrough attendance at program design and progress reviews, Engineering Development Modelinstallations, and at-sea test planning conferences. Participation in overall program reviews shallalso be required during stages from equipment formulation and validation of new concepts,through engineering design and development, test and evaluation, production, deployment,operations and final disposition of equipment being replaced. Task tracking, status of effortstoward accomplishments of milestones, and overall program feedback shall be provided viaperiodic status reports and trip reports.III. PROGRAM MANAGEMENTThe contractor shall maintain a management structure and management reporting system thatensures proper and timely performance, delivery, and completion of all contract requirementsand individual task requirements. The contractor shall appoint a Program Manager to act as thefocal point for all communications between the Contractor and Government. The ProgramManager shall have overall responsibility for accomplishing the efforts ordered under eachTechnical Instruction.The Government may schedule program and technical review meetings to review the status of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!